My WebLink
|
Help
|
About
|
Sign Out
SR 06:051
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2007 1:33:20 PM
Creation date
2/16/2006 1:32:30 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:051
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TASK: <br /> <br />TASK: <br /> <br />TASK: <br /> <br />TASK: <br /> <br />AMENDMENT NO.1 <br />Exhibit B <br /> <br />Additional Potho1ing of Existing Utilities: Review of the eXlstmg utility <br />record drawings provided by the various utility companies requires the need <br />for additional potho1ing in and around the proposed water pipeline services, <br />water turnout station and control valve vaults. Over 40 utilities will cross the <br />proposed water pipe alignment and appurtenant structures. In an effort to <br />avoid utility conflicts during construction additional potholing will be <br />required. <br /> <br />Stoneridge Water Transmission Pipeline (elP No. 031016) <br />Pimlico Turnout and Water Transmission Pipeline (CIP No. 011012) <br /> <br />$5,366.00 <br />$16,018.00 <br /> <br />Locating the eXlstmg 12-inch water main in the previous Stoneridge Road <br />alignment. Task provides for the field surveying staking of the pipeline using <br />record information in combination with the use of ground penetrating radar to <br />accurately locate the existing 12" pipeline that runs parallel to the proposed <br />16" transmission water main. Previous conventional means of pot holing and <br />the use of record information were unsuccessful. <br /> <br />Stoneridge Water Transmission Pipeline (elP No. 031016) <br /> <br />$6,351.00 <br /> <br />Zone 7 Easement: Based on the existing right-of-way needs an easement will <br />be necessary from the Zone 7 Water Agency for the proposed 16" water <br />transmission line between Johnson and Stoneridge Drives. Included in this <br />task is the preparation of Plat Map and legal description to match the project <br />design and the coordination with Zone 7 Water Agency for its dedication of <br />the easement to the City of Pleasant on. <br /> <br />Stoneridge Water Transmission Pipeline (elP No. 031016) <br /> <br />$1,790.00 <br /> <br />Split Bid and Design documents from one package into two. Based on the <br />additional design challenges to move the site location for the Pimlico Water <br />Turnout Station, the additional permitting through Ca1 Trans for the <br />installation of the valve control vault and appurtenant hardware adjacent to <br />Santa Rita Rd, and the resulting difference in project time1ines it was decided <br />that it would be more efficient to split the two CIP projects into two separate <br />projects. This task provides for the preparation of two separate bid packages, <br />separate bid services and support during the construction phase. <br /> <br />Stoneridge Water Transmission Pipeline (elP No. 031016) <br />Pimlico Turnout and Water Transmission Pipeline (elP No. 011012) <br /> <br />$5,145.00 <br />$5,145.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.