<br />TASK: <br /> <br />TASK: <br /> <br />TASK: <br /> <br />Santa Rita Control Valve Station: As part of the Pim1ico project's preliminary <br />design it was determined that additional operation and control features were <br />necessary at the Santa Rita Control Valve Station to meet the operational <br />needs of the water utility department. The proposed design provides for the <br />valves remote operation, the valve's motorized operation, and integrating the <br />motorized valve's operation into the City's SCADA system. The design <br />includes the selection of the site location, valve, motorized controls, <br />appurtenant piping and fixtures, vault design and integration of the valves <br />operational parameters into the City's existing SCADA system to meet the <br />operational objectives of the existing water system. <br /> <br />Pimlico Turnout and Water Transmission Pipeline (elP No. 011012) <br /> <br />$11,200.00 <br /> <br />Pipeline Cathodic Protection: As a result of the soil investigation along the <br />water pipeline alignments for both Pim1ico and Stoneridge project it was <br />determined that the soil conditions possesses corrosive properties. Therefore, <br />this task provides for the design of the galvanic anode cathodic protection <br />system to protect the ductile iron piping against corrosion. <br /> <br />Stoneridge Water Transmission Pipeline (elP No. 031016) <br />Pimlico Turnout and Water Transmission Pipeline (elP No. 011012) <br /> <br />$4,792.00 <br />$9,872.00 <br /> <br />Site Relocation ofPimlico Water Turnout Station: During the preliminary site <br />investigation for the turnout station it was determined that site had utility <br />conflicts that would require underground utilities to be relocated. However, <br />one of the utilities included a PG&E high pressure gas main. Given the <br />potential cost impacts to relocate the line and potential project delays an <br />alternative location was chosen across the street in the landscape area between <br />Pim1ico roadway curb and the soundwall along the 1-680 freeway. This site <br />avoids any major utility relocations but will require further topographic <br />mapping and changes in the existing roadway geometry to accommodate the <br />building footprint for the turnout station. This task includes additional <br />topographic survey, additional design for roadway modifications and <br />necessary sitework design for the turnout station at this location. <br /> <br />Pimlico Turnout and Water Transmission Pipeline (el? No. 011012) <br /> <br />$12,255.00 <br /> <br />2 <br />