Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />NOVEMBER 17. 2005 <br /> <br />13. . SCOPE OF WORK <br /> <br />2.1.1. Surveying - In conjunction with preparing the topographic map, <br />CONSULTANT will survey roadway cross sections, intersection <br />lane configurations, traffic control devices, identify existing <br />underground and overhead infrastructure, and other existing <br />improvements as determined by CONSULTANT as needed to <br />design the roadway. The Project Engineer will supervise the field <br />survey to ensure the field survey includes items for the design team <br />to tie-in affected surface conforms, and overhead facilities. Perform <br />3 days of field surveying. <br /> <br />2.1.2. Field Revievv - The physical characteristics of the site and the <br />surrounding roadway network will be reviewed to identify existing <br />roadway geometry including roadway cross-sections, intersection <br />lane configurations, traffic control devices, and surrounding land <br />uses. In order to address tree and environmental impacts of the <br />project, field explorations will entail compiling a visual and <br />photographic inventory of existing landscape conditions within the <br />project area, including parcel frontage improvements and existing <br />vegetation. <br /> <br />Electrical Facilities - This task will consist of walking the site to <br />help clarify the locations of electrical service facilities and other <br />physical factors affecting the electrical connections. <br /> <br />2.1.3. Pavernent ISoil Evaluation -This project requires the evaluation of <br />the existing pavement section. Our Goetechnical Engineers, GEl, <br />will perform 5 geotechnical borings and prepare a technical <br />memorandum outlining pavement design criteria. Proper <br />documentation of the existing section will affect the design of the <br />reconstruction, the project specifications, and the Contractor's <br />ability to perform the Work at the most cost effective manner. <br />Permission to access the street will be provided by the City. <br /> <br />We would also ask GEl to provide demolition coring so that our <br />demolition plan would identify pavement thickness for construction. <br /> <br />2.1.4. Prelirninary Landscape Surveys - Consultant will provide a basic <br />site investigation and evaluation of existing landscape conditions <br />and report their suitability with respect to protection or removal. <br />Included with this investigation is the identification of any existing <br />trees requiring removal or protection. <br /> <br />2.2. Office Mapping - The aerial topography map combined with the field <br />survey information will serve as the Project Topographic Base Map. Basis <br />of Bearing and Benchmark will be included on the Survey. <br /> <br />~ <br /> <br />BELLECCI & ASSOCIATES. INC <br />