Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />NOVEMBER 17,2005 <br /> <br />B. SCOPE OF WORK <br /> <br />tasks with an elapsed time evaluation, and shall identify tasks that <br />need to be completed with due dates. The schedule will be <br />modified and updated throughout the course of the project. We <br />recommend Advertise and Open Bids in April. In general the <br />project schedule will be a) NTP in January, b) 650/0 plans within 6 <br />weeks of NTP, c) 950/0 plans within 5 weeks of 650/0 review <br />comments, and d) 1000/0 PS&E within 4 weeks of 950/0 review <br />comments. <br /> <br />1.2. Design Team Quality Control - CONSULTANT has an in-house Quality <br />Control Program. There are five steps to our Quality Control Program. <br />Listed below are the Quality Control steps that CONSULTANT shall take. <br /> <br />1.2.1. Independent Plan RevieW' - One of CONSULTANT's outside <br />offices will perform an independent plan review at the 950/0 design <br />level. <br /> <br />1.2.2. Survey Mock-up at the 95%. Submittal - CONSULTANT will <br />performs a field survey stake out of the job at the 950/0 design to <br />verify conforms, cross slopes, downstream connections, sawcut <br />line elevations, benchmarks, monuments, and other pertinent <br />information. <br /> <br />1.2.3. PS&E Checklist for Measurement and Payment- <br />CONSULTANT has a standard form to use to verify consistency in <br />the PS&E for measurement and payment. <br /> <br />1.2.4. Team Presubmittals to CONSULTANT - All Subconsultants are <br />required to submit to CONSULTANT one week prior to each formal <br />submittal to the Client. <br /> <br />1.2.5. Quality Control is Part of Project Schedule - CONSULTANT <br />includes QC in the overall project schedule to emphasize its <br />importance. <br /> <br />2. BASE MAPPING - <br /> <br />The purpose of this phase is to assemble and review existing data, obtain new <br />field data, and prepare geometric drawings (base plans) for the proposed barge <br />canal crossing and roadway improvements. Perform topographic field surveys <br />and develop base plans at a scale of 1" = 20'. <br /> <br />2.1. Field Work <br /> <br />~ BELLECCI & ASSOCIATES, INC- <br />~ CIVIL BNGINBBJtING _ LAND PLANNING. I.AND SLravEYYNG <br />