My WebLink
|
Help
|
About
|
Sign Out
SR 05:297
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2005 9:21:48 AM
Creation date
11/10/2005 8:53:10 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:297
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Honorable Mayor and Members of the City Council: <br />BACKGROUND <br />Beginning in 1990, the City established a series of replacement/renovation funds where reserves <br />are accumulated to fund future replacement costs, in accordance with the City's financial <br />policies. In December 1998, staff began to identify all City assets, including condition, age, and <br />expected replacement/renovation cycles and costs. From this information, a 30-year <br />"Replacement Plan" was developed and integrated into the biannual Maintenance and Operating <br />Budget. Annual revenue requirements were determined for each fund, sufficient enough (with <br />interest income) to fund the projected annual replacement schedules. The replacement accruals <br />minimize Operating Budget fluctuations by amortizing capital costs over multiple fiscal years. <br />It also ensures that the replacement of large dollar items will not compete for budget funding <br />with City services or other capital improvements when the time comes for them to be replaced. <br />As part of the City's Replacement Plan, the Park Renovation Fund provides for major <br />renovations to City parks, and to a small degree, street medians. Typical repairs include <br />irrigation systems, pathways, turf, trees, play areas, signs, and park furniture (barbecues, <br />benches, tables, drinking fountains, etc.). For the past several years, the Parks and Recreation <br />Commission has made project recommendations to the City Council based on available funding. <br />A major update of the Replacement Plan was completed as part of the Operating Budget process <br />in spring 2003, and again in 2005. As a result, the Park Renovation Fund now provides for the <br />long-term replacement/renovation of street median landscaping, City facilities, and trailheads. <br />Due to the amount of work that will be required over the projected 30-year Replacement Plan, <br />variances will occur in the fund balance depending on the number of actual improvements and <br />scheduling. <br />The replacement schedule in "Financing Our Future" was intended to be a "fluid" document that <br />would be modified as park needs warranted. For FY 2005/06, staff has reassessed all City <br />parks, trail facilities, and median areas. The attached list of recommendations is based strictly <br />on maintenance issues and current needs, realizing that the final decisions will be based on <br />public and Commission input, and approval by the City Council. <br />For FY 2005/2006, $113,750 is available for renovation projects. The attached listings indicate <br />the proposed projects by location and estimated costs. The number of recommended projects is <br />significantly less than in recent years. A number of previously funded renovation projects have <br />yet to be initiated, and the improved condition of the parks as a result of previously completed <br />work has decreased the need for major improvements this fiscal year. <br />A significant portion of this year's funding ($45,000) is recommended for the replacement of an <br />existing equestrian/pedestrian bridge at the Preserve Open Space. The current bridge is too <br />small for the intended equestrian use and is becoming unstable. The proposed bridge would be a <br />modular fiberglass structure similar to the new bridges recently installed on the CalJippe <br />Preserve Golf Course trail. <br />SR 05:297 <br />Page 2 <br /> ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.