My WebLink
|
Help
|
About
|
Sign Out
SR 05:304
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2005 3:22:01 PM
Creation date
10/20/2005 3:04:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT NO
SR 05:304
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> EDAW INe WORK PROGRAM <br /> TRANS'T_OF~IENTED SPECIFIC PLAN <br /> FOR ~HE Hf'CIENDA BUSINESS PARK <br />We anticipate working closely with the Project PRODUCTS <br />Team throughout this task, and \VC l,vill provide <br />status updates at key decision-making poir,ls and The products for fhis task include an outline of the <br />as complex questions (lrise. Specific Plan and a refined Preferred Alternative, <br /> which would be developed with Project Team and <br />TASK 5 - REFINEMENT OF A Core Area Planning Team input. These products <br />PREFERRED ALTERNATIVE -- ESTABLISH will sc:rvc as the basis for the Specific Plan <br />SPECIFIC PLAN OUTLINE document. <br />5A Alternative Plan Preparation -- Specifc Plan The preferred plan presentation \vill include a plan <br />Outline view representation of an urban design framework, <br /> public rcalm plan, land use plan, circulation <br />During this \vork task, the Teams will either C1dd diClgram, parking concept, open sp<1ce diagram, and <br />refinements to one of the alternahvl's or eSl:ablish a rclevClnt sketches and diagrams illustrating <br />hybrid plan, which may assemble element~; of two building prototypes and overall character. <br />or more alternatives. This refined analysis will <br />include a highly focused study and testing of the <br />preferred alternative. <br />^ potential outcome of this task may inc1uJe <br />exploration of t1exibility of the pbn to <br />acconunodate variations within the plan itself, su:h <br />as allowing for some upper floor residential or <br />commercial uses within the Plan. FlexibilLy 1Ivill <br />ensure an emphasis on viability through economic <br />cycles. <br />Each member of the Consultant Team will North Natomas Town Center and RT Station, Sacramento <br />undertake refined study during this task, including 5.8. Team Workshop #4: Preferred Plan <br />more detailed studies of overall urban form, the <br />public realm, building prototype:" transpcrtation Presentation and Discussion <br />and parking, and financial viabibty. The Consultant Team will present the Preferred <br />In addition, Strategic Economics \.\fLU projEct the Plan to the Core Planning AreCl Team. The Plan's <br />probable short and long-term fiscal impacts of the key concepts, elements, and assumptions will be <br />preferred alternativc. This will involve inl:ervievvs discussed. <br />with staff from affected City departments. STAGE 3: PRODUCTION OF FINAL <br />ED^ W will also establish an outline for the Specific PLAN DOCUMENTATION <br />Plan during this "'ork task. We propose !:lis step <br />because our experience tells us that planning TASK 6 - VISION AND DESIGN <br />processes tend to evolve, and, with this e\'olution, PRINCIPLES - PREPARE THE DRAFT <br />expectations and goals for the Pla:1 may change. SPECIFIC PLAN <br />Typically these changes occur in the expecta1.ion~; <br />for development standards, desif.';n guidelincs, and 6.A. Draft Specific Plan Preparation <br />methods for describing site-specific dcsAgn <br />recommenda tions. Building on the work undertaken previously, we <br /> will develop a series of design principles which will <br /> underpin the Specific Plan to ensure the realiz,ltion <br /> 0::') <br />
The URL can be used to link to this page
Your browser does not support the video tag.