My WebLink
|
Help
|
About
|
Sign Out
SR 05:250
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:250
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2005 2:20:41 PM
Creation date
9/29/2005 2:12:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/4/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:250
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Three companies submitted proposals. The sealed proposals for the Maintenance <br /> Contract were opened on August 23, 2005, and ranged in price from $l6,335.00 to <br /> $19,602.00 per month for the routine maintenance fee. <br /> For review and selection purposes, the lowest contractor was not based solely on the <br /> monthly flat rate; instead, the selection process incorporated some emergency repair <br /> work quantities. Team Econolite had the lowest monthly flat rate fee, but CalWest was <br /> the lowest contractor based on the flat rate and the extra work selection spreadsheet <br /> shown below. <br /> O""',,_.~.;"a "~~;~'_~n~a Econolite Re""blic CaIWesl <br /> 1) Flat Rate 'i: 16".00 fmo)( 99-$16335.00 ["q9800 Imo x 99" $19602.00 '1:172.00 Imo x 99 = 't.17 026.00 <br /> r:~~~'1' W~..... PV~~Fl..: <br /> Straight Time Work (hourly rate) <br /> 2) Signal Technician 30 hoursX $103.00 = $3090.00 30 hoursX~=$2670.00 30 hoursX~=<l:"550.00 <br /> 3) Signal Supervisor J1 hours X $103.00 = ~1 133.00 J1 hoursX~ = ~1 012.00 J1 hOursX~" ~ 012.00 <br /> - mpsal ~ = '"750,00 <br /> 4) Bucket Truck (oer trip) 15 trips at ----ELQQ. = $1 155.00 15 tripsat~=$750,OO 15 <br /> ~ Percent Percent <br /> 5) Estimated Cost ('Yo) $1,150 + ~=$1322,50 $1,150 + ~=~1380.00 $1,150 + 15% - $1322,50 <br /> (""\,,-'"'....... UTnrl- I':v~mpl.. <br /> Position (hourly rate) <br /> 6) Signal Technician 5 hoursX $151.00 = <t755.00 5 hoursX $155,00 = $775.00 5 hours X $145.00 = '"725.00 <br /> 7) Signal Supervisor 11 hoursX $15100 = $1661.00 11 hoursX $159.00 = <t1749.00 11 hours X $150.00 = $1 650,00 <br /> p<;j,";p.....o>nt w- .":p} trips at $50.00 = <t'lOO.OO <br /> 8) BucketTruck 4 lripsal $nOO-$308,00 4 trips at $50.00=$200,00 4 <br /> ~ Percent Percent Percent <br /> 9) Estimated Cost (%) $600 + ~ = $690.00 $600 + ~=$720,OO $600 + ~='""90.00 <br /> Combined Proposal Price for TOTAL J$28,449.50 TOTAL J$28,858.00 TOTAL =L25927.50 <br /> proposal comparison purposes: CalWest was not selected as the maintenance contractor because they failed to meet the <br /> minimum qualifications for the contract, which requires three (3) years signal <br /> maintenance experience. While the employees of CalWest do have the required <br /> knowledge of traffic signal systems, they only just began signal maintenance projects in <br /> June of this year and were not able to satisfy the minimum requirements of the contract. <br /> The low bid was received from Team Econolite and all bid documents were found to be <br /> in order. Recent work performed by this contactor for other agencies has been verified <br /> to be satisfactory. <br /> SR:05:250 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.