Laserfiche WebLink
<br />FUlldillg: <br /> <br />$15.0 million -ACTA Measure B <br />$1 },3 million -ACTIA Measure B <br />$2.7 million - Local <br />$29.0 million - Total <br /> <br />Tentative Schedule: <br /> <br />Scoping <br />Environmental/Preliminary Engineering <br />Design <br />Right-of-Way Support and Capital <br />Construction Support and Capital <br /> <br />7 <br /> <br />Bellin <br />Spring 2003 <br />Summer 2004 <br />Summer2005 <br />Slimmer 2005 <br />Spring 2007 <br /> <br />End <br />Summer 2004 <br />Fall 2006 <br />Spring 2007 <br />Spring 2007 <br />Fall 2009 <br /> <br />Rev: July 28, 2005 <br />