My WebLink
|
Help
|
About
|
Sign Out
SR 05:271
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2005 2:18:42 PM
Creation date
9/29/2005 2:11:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/4/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:271
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3. Add the I-S8D/Redwood Road Interchange Project in Castro Valley as supplemental <br />improvements to the Hayward Route 238/Mission-Foothill-Jackson Corridor Improvement <br />Project as follows: <br /> <br />Project: <br />Cost: <br />Sponsor: <br /> <br />I-580/Redwood Road Interchange Improvements Project in Castro Valley <br />$29 million ACTA Measure B Sales tax contribution: $15 million <br />Alameda County Transportation Improvement Authority (ACTIA) <br /> <br />Description: <br /> <br /> <br />i <br />l <br /> <br />~ <br /> <br />- . <br /> <br />The project is comprised of the following elements (subject to definition in the <br />environmental document): <br /> <br />. Construct a new westbound off-ramp from 1-580 to Redwood Road; <br />. Construct a new eastbound on-ramp from Redwood Road to 1-580; <br />. Replace the existing eastbound 1-580 off-ramp to Center Street with a new <br />off-ramp to Grove Way; and <br />e Remove the existing westbound on-ramp from Castro Valley Boulevard to <br />1-580. <br /> <br />Cost break-out and proposed schedule are asfollows: <br /> <br />Tentative Cost Breakdown: <br /> <br />Cost <br />($ x 1 million) <br />0.7 <br />0,7 <br />2.1 <br />8.5 <br />17.0 <br />19.0 <br /> <br />Scoping <br />EnvironmentaVPreliminary Engineering <br />Design <br />Right-of-Way Support and Capital <br />Construction Support and Capital <br /> <br />Total <br /> <br />6 <br /> <br />Rev: July 28, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.