My WebLink
|
Help
|
About
|
Sign Out
SR 05:259
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2005 12:13:11 PM
Creation date
9/15/2005 4:27:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />proposed, the turnaround would be located on the future public street and on portions of <br />Lots 5 and 10 of Chrisman. As required, the entire turnaround would be located on pub- <br />lic street right-of-way dedicated to the City. It would be designed to the standards of the <br />Livermore-Pleasanton Fire Department, would be constructed with an all-weather sur- <br />face, and would be covered with a "sunset" requirement such that it would be removed <br />when the Chrisman property develops. The excess right-of-way on Lots 5 and 10 would <br />be abandoned and conveyed back to the Chrismans or their successors. <br /> <br />2. The future homes on the Berlogar Lots 11 through 19 would be required to be equipped <br />with residential fire sprinklers. <br /> <br />3. The Berlogar Lots 11 through 19 would include a recorded disclosure stating that the <br />public street serving these lots will, in the future, be extended as a through street forming <br />a loop road ultimately connecting to Vineyard Avenue. <br /> <br />4. The developer of the Berlogar property would be required to install a large sign at the <br />Chrisman property line stating that the street would be extended through the Chrisman <br />property ultimately connecting to Vineyard Avenue. <br /> <br />5. The developer of the Berlogar property would be required to "stub" full public utilities at <br />the northwesterly property line of the Chrisman property. All public and private utilities <br />serving Chrisman Lots I through 10 would be required to be connected to these utility <br />"stubs". <br /> <br />6. Both the Berloger and Chrisman projects would ultimately have a single homeowners as- <br />sociation to own and maintain common areas and facilities covered by PUD-05 and Tract <br />7399. The homeowners association would be created with the first subdivision. The <br />CC&Rs creating the homeowners association would provide the means by which the de- <br />velopment on the Chrisman property will be annexed into the association. No approval <br />of the existing association or its homeowners will be necessary to effectuate this annexa- <br />tion. The CC&Rs would be subject to the approval of the City Attorney's Office prior to <br />their recordation. <br /> <br />Staff notes that it is not uncommon for the construction ofPUD development plans to be phased. <br />As proposed and conditioned, the Berlogar portion of PUD-05 would be self-sufficient in terms <br />of access, utilities, etc., and would provide utility "stubs" to the westerly side of the Chrisman <br />property. Except for the modifications covered by this application, all previous requirements <br />and conditions would remain in effect. Although the lots would become custom lots, a single <br />project developer would still be able to propose new house designs for the lots as a single appli- <br />cation. <br /> <br />Item 6.c., PUD-05-IM <br /> <br />Page 4 of9 <br /> <br />August 10, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.