My WebLink
|
Help
|
About
|
Sign Out
SR 05:205
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 10:08:49 AM
Creation date
7/14/2005 9:48:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:205
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At this point, there would be a review of the findings by sta~ The identification of adverse impacts <br />and the formulation of responsive mitigation measures in the draft will serve as the basis of the <br />consideration of adjustments in the Option 1 plan capable of reducing the impacts or even, in some <br />cases, fully mitigating some impacts. <br /> <br />Potential revisions in the project will be incorporated into the project description (which will be refined <br />appropriately in Task 3) and corresponding revisions in the draft of the Setting, Impacts, and Mitigation <br />Measures chapter. <br /> <br />Task Group 3 Preparing the Draft EIR <br /> <br />Task 3.1 DEIR Project Refinement <br /> <br />The project description chapter prepared in Task 2.1 will be refined consistent with the results of Task <br />2.3, incorporating where possible locational, physical, and operational characteristics that would result <br />in "built in" mitigation of impacts. This refined project description will serve as the basis of the Draft <br />EIR. <br /> <br />Staff and consultant will agree on the format for the Circulation Drat~ EIR: paper only, or both paper <br />and electronic, as well as any other format considerations. One meeting with staff is assumed for this <br />task. <br /> <br />Task 3.2 Complete Technical Analysis: Setting, Impacts, <br /> Mitigation Measures <br /> <br /> CEQA topics possibly requiring technical analysis and the firms that would perform that analysis are <br /> identified in the table that follows. M&A will scope, direct, review, edit, and integrate the analyses of <br /> specialists into the DEIR. <br /> <br /> Initial Technical Team Possible Additions to Technical Team <br /> Topic i Fi~.~ Topic Firm <br /> <br /> Aesthetics/Visual Resources Environmental Vision Air Quality Donald M. Ballanti <br /> [ (Berkeley) (El Cerrito) <br /> Geology and Soils, I B^SF~LINE Environmental Cultural Resources Wm. Self Assoc. <br /> Hazards/Hazmat, Consulting (Petaluma) (Orinda) <br /> Hydrology/Water Quality <br /> Noise Illingworth & Rodkin <br /> (Petaluma) <br /> Traffic and Transportation Dowling Associates <br /> (direct City contmct) <br /> Vegetation and Wildlife WRA (San Rafael) <br /> <br /> ~Aase [l Speci[ic PJ[a~ £]R Pa.qe 6 Mund~e ~f~ ~ssociates <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.