Laserfiche WebLink
Replacement of Sewer Facilities at Various Locations and <br />InstaUation of New Water Facilities at Longview Drive <br /> <br />Scope of Services <br /> <br />4.0 Preliminary Design Report <br /> Pakpour Consulting Group will prepare a preliminary design report showing existing and proposed <br /> improvements along with a summary cost estimate. The preliminary report will be broken down into <br /> two sections for the Longview Drive Water Line and Annual Sewer Replacement projects. <br /> The report will include recommendations of the pipe materials for the new water line and sizing <br /> based on the hydraulic requirements. The report will also include alternative sewer replacement <br /> solutions for Gale Avenue and Whiting Street. <br /> Pakpour Consulting Group will meet with City of Pleasanton staff to discuss the report and review any <br /> special problem or issues that were encountered. Once the City accepts the report, it will become the <br /> basis for subsequent design work on the project. <br /> <br /> Deliverables: Preliminary Design Report <br /> 5.0 50% Design <br /> The 50% design submittal will consist of two independent sets of design plans, specifications, bid <br /> documents and construction cost estimates for the Longview Drive Water Line and Annual Sewer <br /> Replacement projects. <br /> Progress plans and preliminary technical specifications will be prepared per City of Pleasanton <br /> Standards. The design drawings will be prepared in AutoCAD 2005. The specifications will be in <br /> Microsoft Word 2003 format and will be incorporated into the City's "boilerplate" to produce final bid <br /> documents. <br /> The 50% Plans, Specifications, and Cost Estimate will be submitted for review to the City of <br /> Pleasanton. Pakpour Consulting Group will participate fully in this review process. <br /> <br /> Deliverables: 50% Plans, Specifications and Cost Estimate <br /> <br /> 6.0 90% Plans, Specifications, and Cost Estimate <br /> The 50% Design Documents submitted in the task above will be carried to 90% completion by <br /> adding details, additional notes, and addressing City and other agency comments. Bid quantities will <br /> be estimated for each item of work and a cost estimate prepared based on unit prices for each item. <br /> Unit prices will be determined based on recent bid tabulations from similar projects, job cost media <br /> such as Means, and discussions with local contractors. Cost estimates will be broken down into the <br /> Longview Drive Water Line and Annual Sewer Replacement projects. <br /> Deliverables: 90% Plans, Specifications and Cost Estimate <br /> <br /> 7-2 <br /> <br /> <br />