My WebLink
|
Help
|
About
|
Sign Out
SR 05:187
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:187
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 10:08:49 AM
Creation date
7/14/2005 9:16:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:187
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avenue. BIC is responsible for these off-site improvements among other required <br />infrastructure to serve this development as described below. <br /> <br />OFF-SITE IMPROVEMENTS <br /> <br />Bernal Avenue Improvements <br /> <br />Development of the Bernal Property required a number of improvements along Bernal <br />Avenue, which include street widening, installation of two traffic signals (Bernal/West <br />Lagoon/Meadowlark and Bernal/Valley), traffic striping and median modifications, <br />construction of underground utilities, and paving. The construction of a second bridge on <br />Bernal Avenue is anticipated to occur sometime next year. The bridge construction plans are <br />currently being revised to reflect the modifications to the appearance of the structure approved <br />by City Council. At this time, interim improvements on Bernal Avenue are necessary in order <br />to facilitate in and out traffic for Augustin Knolls and the Windsor development located at <br />Bernal Avenue and Meadowlark Drive. <br /> <br />Bernal Avenue improvements completed and ready for acceptance at this time are: <br /> <br /> · Provisions for triple left turns eastbound on Bernal to northbound Valley Avenue. <br /> · Left turn pocket westbound on Bernal to southbound Valley Avenue. <br /> · Right turn lane eastbound on Bernal to southbound Valley Avenue. <br /> · Right turn lane westbound on Bernal to northbound Valley Avenue. <br /> · Landscaping on Bernal Avenue east of freeway. <br /> <br /> Once the new bridge is constructed, the following improvements will be incorporated on <br /> Bernal Avenue, west of the freeway (these improvements will be accepted when complete): <br /> <br /> · Left turn pocket eastbound on Bernal to Meadowlark Drive. <br /> · Right turn lane westbound on Bernal to Meadowlark Drive. <br /> · Double left turn lanes westbound on Bernal to West Lagoon Road. <br /> · Right turn lane eastbound on Bernal to west Lagoon Road. <br /> · Bernal/West Lagoon/Meadowlark traff~c signal. <br /> · Median landscaping west of freeway. <br /> <br /> The developers have posted improvement bonds to assure the completion of those <br /> improvements associated with construction of the second Bernal Bridge. These improvements <br /> will be included in the First Amendment to the Off-Site Improvement Agreement. <br /> <br /> SR:05:187 <br /> Page 3 of 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.