Laserfiche WebLink
CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />MAC 25, 2004 <br /> <br />A. SCOPE OF WORK <br /> <br />· Aerial photo of site on monthly basis for construction documentation <br /> (Iow cost photo) <br />· Monthly safety meetings <br />· Monthly safety audits <br /> <br />All of the above items would be added to the City standard special provisions, <br />after Section 21. Our goal is to provide the City inspector with adequate <br />contractor language to control the Contractor's site operations in a safe <br />and cooperative manner. <br /> <br />4.3. Construction Cost Estimates - CONSULTANT shall prepare <br /> construction cost estimate based on 50% Plans. The Engineer's <br /> Construction Cost Estimate shall be based on recent contract cost data <br /> from appropriate industry publications, Caltrans Construction Cost Data, <br /> the CONSULTANT's similar projects, or the City's similar projects. Items <br /> shown in the cost estimate shall match items shown in the 50% <br /> specifications bid form. <br /> <br />4.4. Quality Control Review- All team members will make resubmitted to <br /> CONSULTANT one week prior to formal submittal. CONSULTANT and <br /> the designated quality control engineer will review the plans for one week <br /> to evaluate a) interfaces between design disciplines, b) plan sheet format, <br /> c) completeness of submittal, d) dimensions and base file data, and e) <br /> previous comments from stakeholders and City. <br /> <br />4.5. Team Meeting -The design team will assemble and each firm will <br /> receive a compiled list of comments from the quality control engineer at <br /> CONSULTANT. After design team reviews and agrees with the plan <br /> comments, each team member will be responsible to track the quality <br /> control comments. <br /> <br />4.6. Printing Submittal - Each team member will submit revised plans, <br /> specifications, and estimate to CONSULTANT for printing. <br /> CONSULTANT will attend review meeting with City staff to accelerate the <br /> review process. <br /> <br />The CONSULTANT shall submit the 50% PS&E to the CITY for review <br />and comments. <br /> <br />Deliverables: · Three (3) copies of 50% Plan Set <br /> · Three (3) copies of 50% Project Special Provisions <br /> · Three (3) copies of the 50% Cost Estimate <br /> <br />~ BrLL~cc~ & Assoc~^~s, xsc. <br /> <br /> <br />