My WebLink
|
Help
|
About
|
Sign Out
SR 05:160
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2005 2:12:45 PM
Creation date
6/15/2005 1:56:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/21/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />MAY 25, 2004 <br /> <br />A. SCOPE OF WORK <br /> <br />5. 95% PS&E <br /> <br />Following review of the 50% designs, final designs (95%) will be prepared that <br />precisely layout the construction details for the projects. During the 95% design <br />phase, details will be finalized and the contract documents further developed. <br />Subtasks required for the development of the 95% package submittals are: <br /> <br />5.1. Plans / Response to 50% Review - CONSULTANT Team will prepare <br /> 95% plans based on the 50% comments from City review meeting <br /> <br />5.2. Technical Specifications - CONSULTANT shall revise technical special <br /> provisions based on comments from 50% review meeting. <br /> <br />5.3.Construction Cost Estimate - CONSULTANT shall prepare construction <br /> cost estimate based on 95% Plans. <br /> <br />5.4. Quality Control Review-All team members will make resubmitted to <br /> CONSULTANT one week prior to formal submittal. CONSULTANT and <br /> the designated quality control engineer will review the plans for two days. <br /> <br />5.5. Team Meeting -The design team will assemble and each firm will <br /> receive a compiled list of comments from the quality control engineer at <br /> CONSULTANT. <br /> <br />5.6. Print Submittal - Each team member will submit revised plans, <br /> specifications, and estimate with a quality control checklist to <br /> CONSULTANT for printing. <br /> <br />6. 100% SUBMITTAL <br /> <br />6.1. Plans - Response to 95% Review - CONSULTANT Team will prepare <br /> 100% plans based on the 95% comments from City review meeting <br /> <br />6.2. Technical Specifications - CONSULTANT shall revise technical special <br /> provisions based on comments from 95% review meeting. <br /> <br />6.3. Construction Cost Estimate - CONSULTANT shall prepare construction <br /> cost estimate based on 100% Plans. <br /> <br />6.4. DELIVERABLES - CONSULTANT will furnish to the City reproducible <br /> original of all plan sheets plus camera-ready copy of the project <br /> specification for bidding of the project. <br /> <br />~ BI~LLI~CC! & ASSOCIA~S, I.C. <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.