My WebLink
|
Help
|
About
|
Sign Out
PC-91-018
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1991
>
PC-91-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 3:51:21 PM
Creation date
6/8/2005 2:05:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/13/1991
DOCUMENT NO
PC-91-18
NOTES
SHAPELL INDUSTRIES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />other measures which will be imposed in <br />connection with future approvals necessary for <br />development of the project site, have <br />mitigated or will mitigate water supply and <br />delivery impacts of the project to a level of <br />insignificance. <br /> <br />F. Geology, Soils, Grading and Drainage <br /> <br />1. The Planning commission adopts the conclusions <br />of the FEIR with respect to the significance <br />of geology, soils, grading, and drainage <br />impacts of project development. <br /> <br />2. The mitigation measures of the FEIR are <br />feasible and will be required as conditions of <br />project approval. <br /> <br />3. The measures incorporated into the project, in <br />combination with Mitigation Measures of the <br />FEIR, in consideration of the mitigation <br />measures which require additional detailed <br />engineering investigations to more closely <br />define the extent of remedial grading which <br />should be undertaken as well as to address the <br />usual soil engineering concerns pertaining to <br />foundation and roadway design, most of the <br />instability and drainage hazards have been <br />avoided and the geology, soils, seismic <br />activity, and drainage impacts of this project <br />do not constitute a significant adverse effect <br />upon the environment. <br /> <br />G. Noise <br /> <br />1. The Planning commission adopts the conclusions <br />of the FEIR with respect to the significance <br />of noise impact resulting from project <br />development. <br /> <br />2. The mitigation measures are feasible and will <br />be required as a condition of approval. <br /> <br />3. The mitigation measures incorporated into <br />current project, the additional mitigation <br />measures discussed and set forth on the FEIR, <br />and mitigation measures which will be imposed <br />upon future project approvals, have <br />substantially reduced or will reduce the level <br />of noise exposure outside the one-story homes <br />to be built in the 60 Db noise contour so that <br />noise levels meet the General Plan Noise <br />Element guidelines and City noise ordinance <br />requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.