My WebLink
|
Help
|
About
|
Sign Out
PC-91-010
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1991
>
PC-91-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2008 3:50:45 PM
Creation date
6/8/2005 1:37:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/27/1991
DOCUMENT NO
PC-91-10
DOCUMENT NAME
TRACT 6362
NOTES
A-M HOMES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-91-10 <br />Page 1.0 <br /> <br />3l.. There shall be a PSE over the proposed utilities on parcel <br />"D". The utilities in Foothill Road that are shown to be <br />extended shall be installed parallel with Foothill Road. <br /> <br />32. "c" Court, "J" Court, "I" Court, "H" Court, and the stub <br />street between parcel E and lot 31 shall be private and <br />maintained by the homeowners association. These courts or <br />streets shall intersect the public street with a standard <br />driveway rather than a street opening. <br /> <br />33. The sliver fill located between "E" street and "J" Court and <br />the lots 19 and 20 shall be graded at 3:1 unless otherwise <br />approved by the city Engineer. <br /> <br />34. A private access easement shall be granted to the Sorenson <br />property across lot 17 and "I" COURT. This easement shall be <br />shown on the final map. <br /> <br />35. The parallel water main on "E" street between "G" Court and <br />"I" Court shall be eliminated and individual water services <br />shall cross the shear zone to service lots 14, 15 and 16. <br /> <br />36. The 770 water main loop shall extend through the development <br />and along Foothill Road to the northern property line. <br /> <br />37. Unless otherwise approved by the city Engineer, the storm <br />drain pipe across the rear of lot 3 shall be deleted and the <br />open channel extended to the westerly property line. <br /> <br />38. The face of curb radius of the cul-de-sac bulb shall be 45 <br />feet for "G" Court and "F" Court. <br /> <br />39. The project frontage along Foothill Road shall be graded in <br />accordance with the City council-adopted Alignment Plan. <br /> <br />40. The typical section for the private streets and courts shall <br />be similar to the detail for the private driveway, except the <br />curb to curb width shall be 28 feet and parking allowed on one <br />side only. A public Service Easement shall extend over the <br />street area and behind the curb for a distance of 5 feet. <br /> <br />41. The developer shall bear the full cost of the installation of <br />the water reservoir and all necessary pumps, water mains, <br />etc., including land and easement acquisition. The developer <br />shall enter into a reimbursement agreement with the City to <br />recover pro-rata reimbursement from other benefitting <br />properties. Should any excess capacity be constructed in said <br />tank beyond the capacity estimated to be served within the <br />
The URL can be used to link to this page
Your browser does not support the video tag.