My WebLink
|
Help
|
About
|
Sign Out
PC-92-66
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:56 AM
Creation date
5/4/2005 2:38:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/22/1992
DOCUMENT NO
PC-92-66
DOCUMENT NAME
PUD-91-13
NOTES
CHANG SU-O LIN
NOTES 3
122 SF HOMES/18-HOLE GOLF COURSE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Rationale for Findinl1:: The mitigation measure requires access to the open space. This will <br />resolve the current lack of access as identified in the EIR. <br /> <br />POLICE PROTECTION: TRAILS <br /> <br />IMPACT 7. 3D: If trails are not properly designed, police patrolling capability could be hindered <br />in open space areas. FEIR page 7-12. <br /> <br />Mitigation Measure 7.3-6: The project site plan shall be submitted to the Police Chief for <br />review and approval. FEIR page 7-15. <br /> <br />Findinl1:: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Finding: Police Department input into trail design will ensure that police <br />services are properly provided. <br /> <br />ACCESS TO NEIGHBORHOOD RECREATION FACILITIES <br /> <br />IMPACT 7.4A: There is a lack of convenient access to neighborhood recreation facilities in the <br />proposed project. FEIR page 7-16. <br /> <br />Mitigation Measure 7.4-1: Redesign project to include neighborhood recreation facilities. <br /> <br />Finding: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant parks and recreation effect identified in <br />the Final EIR. <br /> <br />Rationale for Finding: Requiring developer provision of neighborhood recreation facilities <br />will resolve this adverse impact. <br /> <br />OPEN SPACE OWNERSHIP AND MANAGEMENT <br /> <br />IMP ACT 7.4B: The project contains large amounts of open space, in addition to the golf course. <br />The ownership and management of the open space has not been determined. Without an effective <br />program for open space, trash dumping and other problems could occur. FEIR page 7-17. <br /> <br />Mitigation Measure 7.4-2: An open space management plan shall be prepared to identify <br />the entity who will own and manage the project's open space. Management and <br />maintenance responsibilities shall be specified and shall be specifically correlated with <br />design-level characteristics of the project. FEIR pages 7-18,7-19. <br /> <br />Finding: Changes or alterations have been required in, or incorporated into the project that <br />avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />12 <br /> <br />" <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.