My WebLink
|
Help
|
About
|
Sign Out
PC-92-66
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-66
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:56 AM
Creation date
5/4/2005 2:38:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/22/1992
DOCUMENT NO
PC-92-66
DOCUMENT NAME
PUD-91-13
NOTES
CHANG SU-O LIN
NOTES 3
122 SF HOMES/18-HOLE GOLF COURSE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />WILDFIRE MANAGEMENT <br /> <br />IMPACT 7.3A: Open space areas adjacent to the proposed houses would create an increasing <br />wildfire hazard over time if left untended. As human occupancy increases in the area, so would <br />the chances of fire as well as the number of people and amount of property value at risk. FEIR <br />page 7-11. <br /> <br />Mitie:ation Measures 7.3-1 and 7.3-2: Prepare a wildfire management plan for the site to <br />reduce the risk of open land wildfires while protecting habitat and other open space values. <br />The plan shall specify ownership, maintenance, use, brush control and fire-resistant <br />landscaping measures, as well as periodic review of these measures, for project open <br />lands. FEIRpages 7-13, 7-14. <br /> <br />Finding: Changes or alterations have been required in, or incorporated into the project <br />that avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Finding:: The standards of the Wildlife Management Plan will limit the <br />project fire protection impacts by reducing the risk of wildfires. <br /> <br />EMERGENCY VEHICLE ACCESS <br /> <br />IMPACT 7. 3B: Emergency routes may not function effectively for emergency use, due to locked <br />gates. FEIR page 7-11. <br /> <br />Mitigation Measures 7.3-3 and 7.3-4: Provide information and make arrangements for use <br />of gates in emergencies. Provide a pamphlet for project residents regarding emergency <br />evacuation. <br /> <br />Finding: Changes or alterations have been required in, or incorporated into the project that <br />avoid or substantially lessen the significant effect identified in the Final EIR. <br /> <br />Rationale for Findine:: The requirements of this mitigation measure will provide the <br />necessary information for emergency routes to function effectively. <br /> <br />ACCESS TO OPEN SPACE <br /> <br />IMPACT 7.3C: There is a lack of access to open space along the east side of the proposed <br />residential subdivision. This access is needed to provide maintenance and to allow emergency <br />access for fire equipment. FEIR page 7-12. <br /> <br />Mitigation Measure 7.3-5: Revise the project site plan as needed to provide emergency <br />access to open space. FEIR page 7-14. <br /> <br />Findine:: Changes or alterations have been required in, or incorporated into the project that <br />avoid or substantially lessen the significant effect identified in the FEIR. <br /> <br />11 <br /> <br />II . I . <br />
The URL can be used to link to this page
Your browser does not support the video tag.