My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8-9 Construct erosion control measures (Draft EIR, page 8-13). <br />said mitigation measure was considered and adopted with any <br />pertinent changes in Condition 8-9, Exhibit "B" of the <br />Planning Commission staff report dated May 27, 1992. <br /> <br />8-10 <br /> <br />Prevent surface erosion (Draft EIR, page 8-14). <br />mitigation measure was considered and adopted with <br />pertinent changes in Condition 8-10, Exhibit "B" of <br />Planning Commission staff report dated May 27, 1992. <br /> <br />Said <br />any <br />the <br /> <br />Finding: <br />Required <br /> <br />Mitigation Measures 8-8 through 8-10 Feasible and <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requ1r1ng the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigations 8-8 through 8-10 into the project design. The <br />applicant and successors in interest shall incorporate such erosion <br />impact reduction provisions into project design as a "Condition of <br />Approval" to the project. <br /> <br />Differential Pill Settlement <br /> <br />Impact: Potential structural damage from differential fill <br />settlement <br /> <br />The City finds that the project may experience damage to structures <br />from differential fill settlement if fill is improperly <br />constructed. This is a potential significant impact (Draft EIR, <br />page 8-14). <br /> <br />proposed Mitigation Measures of the EIR <br /> <br />The EIR identified the following mitigation measures which would <br />substantially avoid this differential fill settlement impact. <br /> <br />8-11 Fill standards for subdivision grading (Draft EIR, page 8-14). <br />Said mitigation measure was considered and adopted with any <br />pertinent changes in Condition 8-11, Exhibit "B" of the <br />Planning commission staff report dated May 27, 1992. <br /> <br />8-12 Fill placement procedures (Draft EIR, page 8-15). Said <br />mitigation measure was considered and adopted with any <br />pertinent changes in Condition 8-12, Exhibit "B" of the <br />Planning commission staff report dated May 27, 1992. <br /> <br />18 <br /> <br />II <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.