My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />32. Mitiqation Measure 8-17: Im~lement Hvdraulic Im~rovements <br /> <br />What: Implement the hydraulic improvements shown on the <br />Drainage Plan <br />Who: Developer and his engineering consultants and <br />contractors <br />When: After approval of subdivision grading permit <br />Timing: Prior to issuance of building permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />33. Mitiaation Measure 8-18: Revise Gradina Plan <br /> <br />What: Provide on-site earthwork balance, or reduce off-haul <br />and limit hauling to a nearby site <br />Who: Developer and his engineering consultants <br />When: Prior to tentative map approval <br />Timing: Prior to grading plan approval <br />Who verifies: Pleasanton Public Works Department <br /> <br />34. Mitiaation Measure 8-19A: Drainaqe of S~rinas. streams and <br />Fills <br /> <br />What: Provide recommendations for controlling drainage from <br />springs or streams, especially for all springs or streams <br />which will be covered by fill. <br />Who: Developer and his engineering consultants <br />When: Prior to building permit approval <br />Timing: Prior to issuance of occupancy permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />35. Mitiaation Measure 8-19B: Groundwater - Drainaqe of Slo~es <br /> <br />What: Evaluate the necessity for drainage of cut slopes <br />Who: Developer and his geotechnical engineering consultant <br />When: Prior to tentative map approval <br />Timing: Prior to issuance of grading permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />36. Mitiqation Measure 8-20: Groundwater - Relation to Surface <br />Drainaqe <br /> <br />What: Evaluate the surface drainage system for the <br />development as a whole to determine the effects of the surface <br />drainage system on the groundwater regime at the site <br />Who:Developer and his geotechnical engineering consultant <br />When: Prior to tentative map approval <br />Timing: Prior to issuance of grading permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />40 <br /> <br />n <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.