Laserfiche WebLink
<br />. <br /> <br />27. Mitiaation Measure 8-11: Fill standards for Subdivision <br />Gradina <br /> <br />What: Provide recommendations and plans for subdivision <br />grading which will minimize differential settlement <br />Who: Developer and his engineering consultants <br />When: Prior to tentative map approval <br />Timing: Prior to issuance of grading permit <br />Who verifies: Pleasanton Public Works Department <br /> <br />28. Mitiaation Measure 8-12: Subdivision Gradina Performance and <br />InsDection <br /> <br />What: Perform approved sUbdivision gradinq work <br />Who: Developer and his engineering consultants and <br />contractors <br />When: After approval of sUbdivision grading permit <br />Timing: Prior to issuance of building permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />29. Mitiaation Measures 8-13 and 8-14: EXDansive Soil Evaluation <br />and Drainaae provisions <br /> <br />What: Provide recommendations and plans for lot grading and <br />foundation construction which will minimize the impacts of <br />soil expansion <br />Who: Developer and his engineering consultants <br />When: Prior to building permit approval <br />Timing: Prior to issuance of occupancy permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />30. Mitiaation Measure 8-15: EXDansive Soil <br />Construction Procedures <br /> <br />Foundation <br /> <br />What: Perform approved foundation construction and lot <br />grading work <br />Who: Developer and his engineering consultants and <br />contractors <br />When: After approval of building permits <br />Timing: Prior to issuance of occupancy permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />31. Mitiaation Measure 8-16: Earthauake Resistant Desian and <br />Construction <br /> <br />What: Provide recommendations and plans designed to minimize <br />building damage caused by earthquakes <br />Who: Developer and his engineering consultants <br />When: Prior to building permit approval <br />Timing: Prior to issuance of occupancy permit <br />Who Verifies: Pleasanton Public Works Department <br /> <br />39. <br />