My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />22. Mitiaation Measures 8-2 throuah 8-6: Sloge sta~ilitv <br />stabilization proaram <br /> <br />What: Evaluate and provide specific design recommendations to <br />stabilize unstable and potentially unstable slopes <br />Who: Developer and his engineering consultants <br />When: Prior to tentative map approval <br />Timing: Prior to tentative map approval (8-2); prior to <br />grading permit approval (8-3 through 8-6) <br />Who Verifies: Pleasanton Public Works Department after <br />geotechnical peer review <br /> <br />23. Mitiaation Measure 8-7: Sloge Stability - Gradina Procedures <br /> <br />What: Perform slope stabilization grading as recommended by <br />developer's geotechnical and civil engineers slopes <br />Who: Developer and his engineering consultants and <br />contractors <br />When: After approval of sUbdivision grading permit <br />Timing: Prior to issuance of building permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />24. Mitiaation Measure 8-8: Erosion Control Plans <br /> <br />What: Provide recommendations and plans for preventing <br />erosion <br />Who: Developer and his engineering consultants <br />When: Prior to tentative map approval <br />Timing: Prior to issuance of building permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />25. Mitiaation Measure 8-9: Construction of Erosion Control <br />Measures <br /> <br />What: Perform approved erosion control work <br />Who: Developer and his engineering consultants and <br />contractors <br />When: After approval of subdivision grading permit <br />Timing: Prior to issuance of occupancy permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />26. Mitiaation Measure 8-10: Surface Erosion Control <br /> <br />What: Planting and hydroseeding <br />Who: Developer and his contractors <br />When: After subdivision grading permit issued <br />Timing: Prior to issuance of occupancy permits <br />Who Verifies: Pleasanton Public Works Department <br /> <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.