My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />17. Mitiaation Measure 7-4: Contri~ute Toward Additional <br />Neiahborhood Park Facilities <br /> <br />Who: DeveloperjPleasanton Planning Department <br />What: Collect the standard park fee and establish public <br />access facility and trial <br />When: Prior to tentative map approval <br />Timing: A building permit issuance <br />Who Verifies: Pleasanton Building Department <br /> <br />18. Mitiaation Measure 7-5: Contribute Toward Additional School <br />Facilities <br /> <br />Who: Developer/Pleasanton Planning Department <br />What: contribute to school facilities funding plan <br />When: Prior to final map approval <br />Timing: Issuance of building permits <br />Who Verifies: Pleasanton Building Department <br /> <br />19. Mitiaation Measure 7-6: Phase the proiect in Relation to <br />Effluent DisDosal CaDacitv <br /> <br />Who: Pleasanton Public Works Department/City Council <br />What: Approval the project growth management allocation when <br />adequate effluent disposal capacity is available <br />When: Prior to growth management allocation decision <br />Timing: At the time of growth management allocation <br />Who Verifies: Pleasanton Public Works Department <br /> <br />20. Mitiaation Measure 7-7: <br />CaDacitv <br /> <br />Who: Developer/Pleasanton Public Works Department <br />What: Require off-site improvement plan to demonstrate or <br />provide adequate downstream sewer collection capacity <br />When: Prior to tentative map approval <br />Timing: At the time of off-site improvement plan approval <br />Who Verifies: Pleasanton Public Works Department <br /> <br />Ensure Adecruate Sewer Collection <br /> <br />CONDITION 8: GEOLOGY, SOILS, GRADING AND DRAINAGE <br /> <br />21. Mitiaation Measure 8-1: SloDe Stabilitv - Analvses <br /> <br />What: Analyze the stability of all critical cut slopes, fill <br />slopes and natural slopes <br />Who: Developer and his geotechnical engineering consultant <br />When: Prior to tentative map approval <br />Timing: Prior to tentative map approval <br />Who Verifies: Pleasanton Public Works Department after <br />geotechnical peer review <br /> <br />37 <br /> <br />.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.