My WebLink
|
Help
|
About
|
Sign Out
PC-92-44
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-44
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:54 AM
Creation date
4/20/2005 4:40:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/27/1992
DOCUMENT NO
PC-92-44
DOCUMENT NAME
GP-91-03/PUD-91-03
NOTES
MARSH/SMITH ASSOCIATES/CASTLEWOOD HEIGHTS
NOTES 3
29 SINGLE-FAMILY LOTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8-3 Provide detailed construction plan for landslide stabilization <br />(Draft EIR, pages 8-11 ad 8-12). Said mitigation measure was <br />considered and adopted with any pertinent changes in condition <br />8-3, Exhibit "B" of the planning commission staff report dated <br />May 27, 1992. <br /> <br />8-4 Control SUbdivision surface drainage (Draft EIR, page 8-12). <br />Said mitigation measure was considered and adopted with any <br />pertinent changes in condition 8-4, Exhibit "B" of the <br />Planning Commission staff report dated May 27, 1992. <br /> <br />8-5 Reduce damage to structures from slope creep (Draft EIR, page <br />8-12). Said mitigation measure was considered and adopted <br />with any pertinent changes in Condition 8-5, Exhibit "B" of <br />the Planning Commission staff report dated May 27, 1992. <br /> <br />8-6 Implement grading procedures for slope stabilization (Draft <br />EIR, page 8-12). Said mitigation measure was considered and <br />adopted with any pertinent changes in Condition 8-6, Exhibit <br />"B" of the planning commission staff report dated May 27, <br />1992. <br /> <br />Finding: Mitigation Measures 8-1 through 8-6 Feasible and Required <br /> <br />The City finds that it is feasible to mitigate this impact to a <br />less-than-significant level by requiring the applicant and <br />successors in interest to incorporate the specific provisions of <br />Mitigations 8-1 through 8-6 into the project design. The applicant <br />and successors in interest shall incorporate such geotechnical <br />impact reduction provisions into project design as a "condition of <br />Approval" to the project. <br /> <br />stream, Gully and Sheet Erosion <br /> <br />Impact: potential for stream, gully and sheet erosion <br /> <br />The City finds that the project could experience stream, gully and <br />sheet erosion which can cause landslides and sedimentation build-Up <br />in creeks and other drainageways. This is a potential significant <br />impact (Draft EIR, page 8-13). <br /> <br />proposed Mitigation Measures of the EIR <br /> <br />The EI~ identified the following mitigation measures which would <br />substantially avoid this erosion impact. <br /> <br />8-8 <br /> <br />Prepare erosion control plans (Draft EIR, page 8-13). <br />mitigation measure was considered and adopted with <br />pertinent changes in Condition 8-8, Exhibit "B" of <br />Planning commission staff report dated May 27, 1992. <br /> <br />Said <br />any <br />the <br /> <br />17 <br /> <br />II <br /> <br />. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.