My WebLink
|
Help
|
About
|
Sign Out
PC-92-25
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1992
>
PC-92-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:52 AM
Creation date
4/20/2005 3:42:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/11/1992
DOCUMENT NO
PC-92-25
DOCUMENT NAME
PUD-89-17
NOTES
CURRIN CONSTRUCTION
NOTES 3
54 SINGLE-FAMILY HOMES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Sanitary Sewer <br /> <br />25. The developer shall install all sanitary sewer lines within the <br />project boundaries, and shall extend the city's sewer line to <br />serve the project. All sanitary sewer lines shall be installed <br />within the street right-of-way or dedicated pUblic service <br />easement (PSE). The City's Public Works Department will <br />determine if the existing sanitary sewer line must be upgraded <br />by the developer to accommodate the increased wastewater <br />generated by the proposed project. (MM 7f) <br /> <br />26. The developer shall install sewer lift stations along Foothill <br />Road, in accordance with the requirements and specifications of <br />the City's Public Works Department. (MM 7g) <br /> <br />27. <br /> <br />Individual pump grinder stations shall be provided for Lots <br />60, 61 and 63, in accordance with the specifications <br />requirements of the City Engineer. The pumps shall be owned <br />maintained by individual lot owners. (MM 7h) <br /> <br />59, <br />and <br />and <br /> <br />28. Prior to approval of the tentative map, the sanitary sewer <br />system shall be redesigned , such that the approved nine-lot <br />subdivision on the east side of Foothill Road can be served by <br />a gravity sewer line. This redesign shall be shown on the <br />tentative map utilities plan. <br /> <br />utilities and streets <br /> <br />29. The sanitary sewer and water mains shall be designed such that <br />the lines are ont he same side of the street throughout the <br />entire loop street. <br /> <br />30. The storm drain inlets from the open space areas shall be <br />relocated closer to the street, or maintained privately. These <br />inlets shall incorporate a permanent desilting basin. <br /> <br />31. Unless otherwise approved by the City Engineer, all public storm <br />drain lines shall be within the street right-of-way. All other <br />lines shall be private and maintained by individual homeowners. <br /> <br />32. storm water runoff from each lot shall be directed to the street <br />or an approved storm drain system unless otherwise approved by <br />the Building Official and City Engineer. <br /> <br />33. The project engineer shall verify that the capacity of the storm <br />drain swale along the northerly property line and the existing <br />culverts under Foothill Road are adequate to handle the storm <br />water run-off. To the satisfaction of the City Engineer, the <br />developer shall mitigate any storm water/storm drainage problems <br />which may result from the project. <br /> <br />34. All proposed v-ditches shall be constructed of concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.