My WebLink
|
Help
|
About
|
Sign Out
PC 05/24/1995
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
1990-1999
>
1995
>
PC 05/24/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2017 3:56:41 PM
Creation date
3/30/2005 1:50:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
5/24/1995
DOCUMENT NAME
PC 05/24/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Condition 59: Mr. Churka inquired about submitting plans on computer disk. He was not <br />aware of this technology. Mr. Iserson noted this is a standard condition and advised he <br />speak to the Building Department to verify what programs they could utilize. <br /> <br />Condition 60: Mr. Churka asked that the signal box be relocated across the street. <br /> <br />Commissioner McGuirk inquired whether there was a walkway available for people using the <br />walk-up window. He was told there will not be a walkway in this area. <br /> <br />PUBLIC HEARING WAS CLOSED <br /> <br />The Commissioners discussed the color choices as opposed to the direction they gave at the <br />last hearing -- light base/dark trim. The Commissioners want the applicant to continue <br />working with staff as to color choice from the approved color palette. <br /> <br />The Commission discussed the brick/wrought iron walls and whether the wall at the deck <br />area should be lowered as well. Staff is recommending that it be lowered. Commissioner <br />Barker noted the applicant opened this area up and prefers to accept the modifications as <br />designed by the architect. <br /> <br />Regarding the handicapped access, Chairman Wright has no concern with the proposed lift <br />and does not feel it will stigmatize handicapped persons. He does have concern that it blend <br />in with the building design and color. <br /> <br />Commissioner Barker inquired of staff if the applicant has to wait for the street widening <br />project to start before beginning his project. Mr. Higdon advised that the Engineering <br />Department would quickly get a plan prepared after the applicant pulled his building permit <br />so as to coordinate the two projects simultaneously. Mr. Higdon also advised that the City <br />will need an eight foot public service easement on Ray Street to pull the overhead utility <br />lines. This should be added to Condition 13. <br /> <br />Chairman Wright requested an addition to Condition 12 stating the curbing must be painted <br />red at the walk-up window. <br /> <br />In response to Commissioner McGuirk, staff advised that the Title 24 guidelines require <br />handicapped access at all entrances. Commissioner McGuirk inquired about any enforcement <br />measures if the motorized lift breaks and is not repaired in a timely manner. Mr. Iserson <br /> <br />thought a private lawsuit could be brought by a handicapped individual against the building <br />owner. <br /> <br />Chairman Wright did not feel that Condition 45 needed to be modified. <br /> <br />Planning Commission Minutes <br /> <br />Page 6 <br /> <br />May 24, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.