Laserfiche WebLink
<br />Resolution No. PC-2004-06 <br />Page Four <br /> <br />Public Works Department. Urban clean water runoff measures will be <br />incorporated into the project through conditions of approval. The property is not <br />located in the Alquist-Priolo Study Zone. The flood hazard maps of the Federal <br />Emergency Management Agency (FEMA) indicate that the Arroyo del Valle is <br />located within the 100-year flood area. However, all proposed development <br />would be outside this area. Therefore, as conditioned, the grading is designed in <br />keeping with the best engineering practices and would have a minimal impact on <br />the environment, and this finding can be made. <br /> <br />6. Adequate public safety measures have been incorporated into the design of <br />the proposed development plan. <br /> <br />The improvements associated with this project would be consistent with City <br />design standards. All on site drive aisles meet City standards for emergency <br />vehicle access. As conditioned, the address on the monument sign would be <br />indirectly illuminated at night for easy reading by emergency personnel. The <br />building would be equipped with an automatic fire suppression system <br />(sprinklers). The project would be required to comply with all building and fire <br />code requirements. Therefore, the plan has been designed and conditioned to <br />incorporate adequate public safety measures, and this finding can be made. <br /> <br />7. The proposed development plan conforms to the purposes of the PUD <br />District. <br /> <br />The proposed PUD development plan conforms to the purposes of the PUD <br />District. One of these purposes is to ensure that the desires of the developer and <br />the community are understood prior to the commencement of construction. The <br />proposed project implements the purposes of the PUD ordinance in this case by <br />providing a Downtown office building that is well-designed and sited on the <br />subject property, that fulfills the desires of the applicant, and that meets the City's <br />General Plan and Downtown Specific Plan goals and policies. The PUD process <br />allows for ample input from the public and for an ultimate decision by the City <br />Council regarding the appropriateness of the proposed use and development plan. <br /> <br />Through the PUD process, the proposed project has provided residents, the <br />applicant, and the City with a rezoning and development plan which optimizes the <br />use of this underutilized infill site in a sensitive manner. Therefore, this finding <br />can be made. <br /> <br />8. For the reasons articulated above, the proposed rezoning is consistent with <br />the objectives of the Zoning Ordinance set forth in Pleasanton Municipal <br />Code Section 18.04.010. <br />