Laserfiche WebLink
.- 6. PUBLIC HEARINGS AND OTHER MATTERS <br />a. PUD-40, R. J. Wilson/Mardeh L.L.C. <br />Application for PUD development plan approval to construct an approximately <br />3,464-squaze-foot single-story home with a loft on an existing 1.675-acre portion <br />of a 22.28-acre lot located on Vineyard Avenue, west of 2500 Vineyazd Avenue, <br />in the Vineyard Avenue Corridor Specific Plan Area. Zoning for the property is <br />PUD-LDR/OS (Planned Unit Development -Low Density Residential/Open <br />Space) and Community Pazk District. <br />Ms. Kline summarized the staff report and described the proposed project's scope and <br />history. She noted that at this time, there was no specific design plans for the community <br />park; the pazk would be designed and paid for by the City. As part of the PUD <br />development plan, the Commission would be asked to approve the northern portion of the <br />property for the one-lot development. Pleasanton Gazbage Service filed an application to <br />subdivide the property into two, if this current application were to be approved. <br />Ms. Kline noted that the windows to serve the loft would be located on the front of the <br />house so that the back of the house maintained asingle-story appearance; the <br />second-story windows would not look onto East Bay Regional Pazk District's property. <br />The house would be designed in the Craftsman style, and a grading berm would be <br />constructed along Vineyard Avenue to provide the traffic noise attenuation as required by <br />_ the Specific Plan. The site development standards used for this project meet or exceed <br />those specified in the Specific Plan. Minimal grading would be necessary, except for the <br />berm. Staff asked the developer to do several additional test pits to ensure that there was <br />no debris buried under this portion of the site. The developer complied and found that <br />there was nothing buried that was not mapped. Staff finds the building azchitecture to be <br />very attractive and is consistent with the other 26 houses in Delco Builders' adjacent <br />Vineyard View and Vineyard Hills developments. <br />Ms. Kline advised that the developer agreed to include green building measures, similar <br />to its other units under construction. The proposed landscaping is comprised of a mix of <br />both natives and ornamental landscaping; it was designed by the same landscape architect <br />who designed the development to the west of this project. Per the Planning <br />Commission's direction after the initial review PUD for Vineyard View and Vineyard <br />Hill, the fencing would be an open style to maintain the rural character. There is a small <br />open space area on the northern side of Vineyard Avenue included in this lot at the <br />easternmost end. It contained an underground collection system for leeching from the old <br />landfill, which cannot be used and will be maintained as open space. <br />Ms. Kline advised that a visual analysis was done, per the Specific Plan. She pointed out <br />that View 1 showed solid fencing because the photomontage creator was not apprised of <br />the open fencing that would be used. Staff had not received any comments concerning <br />the project. Staff recommends that the Planning Commission recommend approval to the <br />City Council for the project. She wished to make a clarification of Condition 36 and <br />- stated that a 60 KV high-voltage line went through a portion of the property, running <br />PLANNING COMMISSION MINUTES, December 8, 2004 Page 3 of 19 <br />