My WebLink
|
Help
|
About
|
Sign Out
PC 101304
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2000-2009
>
2004
>
PC 101304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 9:46:39 AM
Creation date
3/16/2005 1:27:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
10/13/2004
DOCUMENT NAME
PC 101304
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_- f. PDR-402, Citv of Pleasanton <br />Application for design review approval to renovate the existing Pleasanton <br />Veterans Memorial Building located at 301 Main Street. Zoning for the property <br />is "O" (Office) District and Downtown Revitalization Overlay District. <br />This item was continued to the October 27, 2004 Planning Commission meeting. <br />7. MATTERS INITIATED BY COMMISSION MEMBERS <br />Canyon Meadows <br />Commissioner Sullivan noted that a resident of Canyon Meadows had asked him about <br />the status of the road improvements, especially from the eastbound turning pocket. <br />Ms. Kline replied that the future road plan will have a 12-foot wide dual left-turn lane, <br />with two 13-foot travel lanes on either side. Six-foot bicycle lanes will be placed on each <br />side from the Farmer's Insurance building to the western edge of Canyon Meadows. She <br />noted that the Canyon Meadows developer, J&L Construction, left in 1989 before <br />completing the Dublin Canyon improvements. She noted that it took a number of years <br />to collect on the bond and added that in order to accomplish the widening, a culvert must <br />be built over a creek, and in the meantime, the construction of the culvert is entangled <br />with environmental issues. To replace it, the new structure over the creek would be <br />_ within the confines of the creek. The Regional Water Quality Boazd and other outside <br />agencies as well as the Public Works Department are working on this issue. Ms. Kline <br />also indicated that the CEQA process must be completed before any work can begin. <br />In response to an inquiry by Commissioner Sullivan whether the turn pockets could be <br />completed, Ms. Kline replied that she would follow-up on the possibility of an interim <br />re-striping project. <br />Commissioner Kamenv <br />Commissioner Kameny advised that this would most likely be his last meeting and that <br />he would not be available on October 27, 2004. He expected that a new alternate would <br />be appointed by that time. He thanked staff for making his job easier and for providing <br />accurate answers. He noted that it had been a pleasure working with his fellow <br />Commissioners and wished them good fortune in the future. He was proud of the town <br />that Pleasanton had become and hoped that the Commission would continue in that <br />direction to make the decisions that will benefit all members of the community. He also <br />thanked his fiancee, Marty Wadekamper, who was very patient with the long hours spent <br />reading staff reports and attending meetings. <br />Chairperson Roberts extended best wishes to Commissioner Kameny. <br />PLANNING COMMISSION MINUTES, October 13, 2004 Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.