Laserfiche WebLink
<br />Commissioners Dove and Lutz also support staff recommendation of denial. Chairwoman Barker <br />also agrees with the staff recommendation. <br /> <br />. Commissioner Cooper motioned, seconded by Commissioner McGuirk, that the findings for the <br />proposed major modification to the PUD Development Plan cannot be made and adopt a <br />resolution denying Case PUD-90-18-2M with the stipulations that the carport be removed <br />within 30 days of the Planning Commission's action and the hillside be restabilized to the <br />satisfaction of City Engineers and the adjacent landowner. <br /> <br />ROLL CALL VOTE <br /> <br />AYES: <br />NOES: <br />ABSENT: <br />ABSTAIN: <br /> <br />Commissioners Dove, Cooper, Lutz, McGuirk and Chairwoman Barker <br />None <br />Commissioner Wright <br />None <br /> <br />Resolution No. PC 96-66 was entered denying the major modification to PUD-90-18-2M, as <br />motioned. <br /> <br />c. UP-96-52/Z-96-195. East Bav Rel!:ional Park District <br />Application for a conditional use permit to operate 25 recreational vehicle campsites and design <br />review approval to pave an 857 parking space parking lot in the Shadow Cliffs Regional <br />Recreation Area. The 298-acre park is located south of Stanley Boulevard approximately 3,600 <br />feet east of the intersection of Stanley Boulevard and Bernal Avenue. Zoning for the property <br />is P (Public and Institutional) District. <br /> <br />. <br /> <br />Continued to September 25, 1996. <br /> <br />d. PUD-81-30-67D. Britannia Develonments <br />Application for PUD design review approval for the construction of a two-story office building, <br />totaling 129,800 square feet, in the proposed Britannia office complex located at 4001 Hopyard <br />Road. Zoning for the property is PUD (Planned Unit Development) - I/C-O (Industrial! <br />Commercial-Office) District. <br /> <br />Mr. Iserson presented the staff report on the Britannia Developments application for PUD design <br />review approval to allow the construction of a two-story office building totaling 129,800 square feet <br />of floor area on a 7.5 acre parcel within Hacienda Business Park. The site is located at the northeast <br />comer of Hopyard Road and Coronado Lane. This is the sixth phase of Britannia office complex, <br />and will be used as an office building as opposed to the last few Britannia buildings which had <br />warehouse components. <br /> <br /> <br />The master plan for this development indicates how traffic circulation will work within the whole <br />Britannia complex. The building will be constructed with concrete tilt-up walls in beige colors with <br />columns and teal windows and frames. About 29% of the site will be landscaped, and the proposed <br />shrub material corresponds to the Hacienda Design Guidelines. Outdoor seating will be provided. <br /> <br />. <br /> <br />Planning Commission Minutes <br /> <br />Page 5 <br /> <br />September 11, 1996 <br />