My WebLink
|
Help
|
About
|
Sign Out
SR 05:055
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2005 9:12:21 AM
Creation date
2/10/2005 8:45:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/15/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:055
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A draft phase II specific plan for the entire 31 g-acre City-owned area was prepared by the <br /> Bernal Specific Plan Task Force, and a design competition was conducted for the Plan <br /> area. The Draft Plan is now being informally reviewed by the City Council for possible <br /> updates prior to being processed through formal public hearings. <br /> · A draft community park master plan for approximately 50 of the 318-acre area as most <br /> recently prepared by M.D. Fotheringham, Landscape Architects (MDF) and reviewed by <br /> the Community Park Task Force. This plan is now being scheduled for informal review <br /> prior to being processed through the formal public hearing process. <br /> · Phase One Baseball Fields Plan (two lighted baseball fields and other public amenities) <br /> for an approximately ten-acres of the Community Park site was prepared by MDF. This <br /> project is about to be processed through the PUD development plan and environmental <br /> review hearings and preparation of construction documents. <br /> <br />The Draft Phase II Specific Plan update and the Phase One Baseball Fields Plan review processes <br />have already been determined by the Council. The Community Park Master Plan, however, just <br />recently reached the point where it would now be timely for the Council to establish the public <br />review process for it as well. Staff feels that it would be useful to combine the Park Master Plan <br />process with the Specific Plan update process to ensure that the two plans end up consistent with <br />one another. Upon completion of the Park Master Plan, the conceptual outline of the Community <br />Park area and the primary Park policy measures can be merged into the Draft Phase II Specific <br />Plan. <br /> <br />The purpose of the following report is to provide background information, options and staff <br />recommendations for conducting the Community Park Master Plan review process. The current <br />status of each of the three Bernal planning processes identified above are discussed in greater <br />detail below to help in understanding how the Park Master Plan fits into the overall scope of <br />planning for the Bernal Property. The plan areas for each of the three processes are shown on <br />Attachment-1 to this report for your information. Following the presentation of process <br />background information below, additional background is provided regarding the "Initiative to <br />Save Our Community Park," and how it impacts the Park Master Plan. Two options for <br />conducting the Park Master Plan review process are then presented for Council consideration. <br /> <br />STATUS OF BERNAL PROPERTY PLANNING <br /> <br />As noted above, three planning processes for the City-owned portion of the Bernal Property are <br />now underway. These include: <br /> <br /> · Draft Bernal Property Phase II Specific Plan <br /> · Community Park Master Plan <br /> · Phase One Baseball Fields Plan <br /> <br />SR 05:055 <br />Page 2 of 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.