Laserfiche WebLink
<br />Resolution No. PC-96-30 <br />Page 2 <br /> <br />The proposed development would strengthen the office uses in Signature Center <br />and Center Park and would create a significant amount of employment for <br />Pleasanton. <br />Closing Morse Drive would divert project and surrounding traffic presently <br />using Morse Drive to reach Hopyard Road onto Franklin Drive and Johnson <br />Drive. However, as a circulation feature, Morse Drive is not needed. Franklin <br />Drive and Johnson Drive provide excellent alternatives for Morse Drive. <br />Because cross-traffic on Franklin Drive is, at the present time, expected to be <br />low to moderate, it is not expected that significant queuing problems would <br />develop at any of the driveway entrances for the existing and proposed <br />developments on these streets. However, when build-out occurs of the vacant <br />properties on Franklin Drive, it may be necessary to install a two-way left-turn <br />on Franklin Drive between Morse Drive and Johnson Drive. Since installation <br />of the left-turn lane is predicated upon traffic volumes at build-out, its <br />installation, if required, would occur prior to construction of the fifth Providian <br />building. <br />In compliance with the City's non-point storm drain run-off ordinance, the <br />trash/generator enclosures will be covered and connected to the City's sanitary <br />sewer system, and oil/water separators will be installed in the parking lot. <br />According to the United States Department of Housing and Urban Development <br />Flood Hazard Maps, no portion of the site will be affected by the 100-year or <br />the 500-year floods. <br /> <br />2. The proposed development plan modification is consistent with the Pleasanton <br />General Plan: <br />The subject property is designated by the Land Use Element of the Pleasanton <br />General Plan for Business Park land uses. The proposed office uses conform to <br />this land use designation. The overall floor area ratio for the proposed project <br />would be 25.3%, which conforms to the 60% maximum floor area ratio allowed <br />for this site by the Pleasanton General Plan. <br />Based on the proposed project's traffic analysis, levels-of-service on Hopyard <br />Road and Signature Drive intersections and freeway interchanges would be <br />within the level-of-service standards of the Pleasanton General Plan. <br />Providian is required to participate to its pro-rata share in any future assessment <br />district funding the construction of the 1-680/West Las Positas Boulevard <br />freeway interchange. With this requirement, the Providian development <br />conforms to the level-of-service standards stated in the Circulation Element of <br />the Pleasanton General plan. <br />Closing Morse Drive is consistent with the policies of the General Plan's <br />Circulation Element: phasing development and roadway improvements so that <br />Levels-of-Service (LOS) do not exceed LOS "D" at major intersections; <br />designing and regulating City streets to minimize traffic related impacts on <br />adjacent land uses; and maximizing traffic safety for automobile, transit, bicycle <br />users, and pedestrians. <br />