Laserfiche WebLink
<br />Resolution No. PC-96-l6 <br />Page 6 <br /> <br />b) Landscape berms and clusters of shrubs shall be added to the 20 ft. wide <br />setback area between the patio screenwall and the proposed Mohr Avenue <br />sidewalk. These changes shall be submitted for the review and approval <br />by the Planning Director on the plans submitted for the issuance of a <br />building permit. <br /> <br />7) The use of the patio areas for storage purposes or for the hanging of laundry shall be <br />strictly prohibited. The operator shall advise all residents and diligently enforce this <br />policy. <br /> <br />8) The developer shall negotiate in good faith to obtain approval from the County, Zone 7, <br />and East Bay Regional Park District for installing and maintaining landscaping in a the <br />portion, approximately 30 feet in width, ofthe former Southern Pacific Railroad <br />right-of-way along the project site's eastern property line prior to the occupancy of the <br />facility. In the eventuality that permission is granted, the developer shall install <br />landscaping, comprised of native trees, shrubs, and groundcover, subject to the review <br />and approval by the Planning Director, and maintain and irrigate the landscaping at all <br />times in an appropriate manner. If the permission is obtained for said landscaping, an <br />open style fencing, subject to the review and approval by the Planning Director, shall be <br />installed along the eastern property line instead of the 6 ft. high solid fencing shown on <br />the plans. <br /> <br />9) The developer shall negotiate in good faith with the owner of the adjacent office <br />building to obtain an agreement for overflow parking during the evenings and weekends <br />in that parking lot in the event that the on-site spaces of the assisted living facility are <br />filled. The developer shall also revise the off-site improvement plans to show on-street <br />parking spaces along the north side of Mohr Avenue in front of the project. This <br />agreement and the revised improvement plans showing on-street parking shall be <br />submitted for the review and approval by the Planning Director prior to the issuance of a <br />building permit. <br /> <br />10) The developer shall be responsible for the completion of street frontage improvements <br />across the project frontage and the adjacent County-owned transportation corridor <br />(former railroad right-of-way) to the east. In addition, the developer shall install a new <br />concrete curb and gutter on the south side of Mohr Avenue from Kolin Street to the <br />eastern portion of the transportation corridor. The plans for these improvements shall be <br />submitted for the review and approval by the City Engineer prior to the issuance of a <br />building permit. <br /> <br />11) The developer shall install state-of-the-art filtering devices for the cooking facilities at <br />the time of construction of the building. These specifications of these filtering devices <br />shall be submitted for the review and approval by the Chief Building Official on the <br />plans submitted for the issuance of a building permit. <br />