My WebLink
|
Help
|
About
|
Sign Out
PC-97-52
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-52
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:08 AM
Creation date
12/29/2004 10:30:48 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/11/1997
DOCUMENT NO
PC-97-52
DOCUMENT NAME
PUD-80-16-10M/PUC 80-16-17D
NOTES
PROVIDIAN BANCORP
NOTES 3
MAJOR MOD: INCREASE FLOOR AREA; BUILDING DESIGN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-52 <br />Page 2 <br /> <br />would be 24.7%, which conforms to the 60% maximum floor area ratio allowed <br />for this site by the Pleasanton General Plan. <br /> <br />Based on the proposed project's traffic analysis, levels-of-service on north <br />Pleasanton streets, intersections, and freeway interchanges would be within the <br />near term level-of-service standards of the Pleasanton General Plan. Long-term <br />build-out scenarios for north Pleasanton, with and without Providian's proposed <br />building expansion, requires construction of the 1-680/W est Las Positas <br />Boulevard freeway interchange, or implementation of alternate means identified <br />to mitigate north Pleasanton traffic levels to General Plan standards. Providian <br />will execute an agreement with the City to pay its pro-rata share in any future <br />assessment district or program. With this requirement, the Providian <br />development conforms to the level-of-service standards stated in the Circulation <br />Element of the Pleasanton General Plan. <br /> <br />Providian will continue to stagger its work hours so that employees avoid the <br />morning/evening peak-hour commute times, will continue to actively participate <br />in TSM programs reducing its impact to north Pleasanton intersections and <br />freeway interchanges, and will operate its own shuttle service to BART. <br />Adequate on-site parking is provided for the employees of the proposed <br />development based on floor area, employee density, and number of work shifts. <br /> <br />3. The proposed development plan modification is compatible with previously <br />developed properties located in the vicinity ofthe site: <br /> <br />The proposed building is designed to match the architectural style established by <br />the existing Providian structures regarding materials, colors, detailing, and the <br />"bowed" building elements which bisect the existing structures. <br /> <br />4. The development plan modification is compatible with the natural, topographic <br />features of the site: <br /> <br />The overall site has been graded in conjunction with construction of the <br />previously approved, five-building development. Project specific grading is <br />limited to that required for preparation of the building pad. <br /> <br />5. The grading proposed in conjunction with the development plan modification <br />takes into account environmental characteristics and is designed in keeping with <br />the best engineering practices to avoid erosion, slides, or flooding to have as <br />minimal an effect upon the environment as possible: <br /> <br />The subject property is not located in the Alquist-Priolo Special Studies Zone. <br />Requirements of the Uniform Building Code -- implemented by the City at the <br />building permit review -- would ensure that building foundations are properly <br />constructed. Erosion control, stormwater runoff, dust suppression measures <br />
The URL can be used to link to this page
Your browser does not support the video tag.