Laserfiche WebLink
<br />sign" to allow the business name of the facility in addition to displaying the names of the <br />City's service clubs. The final design ofthis new sign shall be subject to the review and <br />approval by the Planning Director prior to the installation of the sign. <br /> <br />21.) At no time shall balloons, banners, pennants, or other attention-getting devices be utilized <br />on the site except as allowed by Section 18.96.060K of the Zoning Ordinance for a <br />maximum length of30 days after the commencement of business (grand opening). At no <br />time shall spot lighting be used. <br /> <br />Construction Practices <br /> <br />22.) All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Saturday. All construction equipment must meet <br />DMV noise standards and shall be equipped with muffling devices. The applicant shall <br />provide the City and residents with a local phone number for the developer which they <br />may use to report and receive prompt action regarding violations to these construction <br />conditions, i.e. working outside the permitted work hours, airborne dust, and other <br />problems with the construction company. <br /> <br />23.) At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed from the site <br />at the end of each work day. <br /> <br />24.) Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />25.) Final inspection by the Planning Department is required prior to occupancy. <br /> <br />26.) The haul route for all materials to and from this development shall be approved by the City <br />Engineer prior to the issuance of an encroachment permit. <br /> <br />27.) The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. The construction company shall actively water the site to the maximum extent <br />feasible during grading activities to minimize the creation of dust caused by such activities. <br /> <br />28.) Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at full expense to the developer. <br />This shall include slurry seal, overlay, street reconstruction, or restriping if deemed <br />warranted by the City Engineer. <br />