Laserfiche WebLink
<br /> <br />EXHIBIT A <br /> SCOPE OF SERVICES <br /> <br /> <br />Tasks are broken down as follows: <br /> <br />1. Review the City’s current backflow program, potable distribution system, relevant existing City <br />standards, and composition of end-user types for classification of low and high-risk hazard <br />potential. <br />a. Evaluation shall take into account the potential for auxiliary water supplies (e.g. wells), <br />pumping systems, or pressure systems, and existing standards for residential fire systems. <br /> <br />b. Following review of City standards of applicable designs (e.g. residential fire protection <br />systems, backflow prevention, etc.), consultant shall provide City with recommended <br />changes, if any, to ensure compliance with the CCCPH. <br /> <br />2. Prepare the City’s Cross-Connection Control Plan (CCCP) in time for submittal by the July 1, <br />2025, due date in compliance with CCCPH Chapter 3, Article 1, Section 3.1.4(b), the information <br />acquired from Task 1, and any concurrent Hazard Assessments effort under Task 3. <br /> <br />a. The responsible signatory of the City’s CCCP will be the City’s Utilities Manager. <br /> <br />b. Advise on approach to address City’s compliance with CCCPH Chapter 3, Article 2, <br />Section 3.2.2(e) for existing residential fire protection systems without DC protection. <br />i. City currently has an estimated 612 known parcels <br /> <br />c. Advise and develop a public outreach and educational program for City’s review/approval <br />and inclusion under City’s to be developed CCCP section 9, in compliance with CCCPH <br />Chapter 3, Article 1, Section 3.1.3(a)(9). <br />i. In Bidder “Fee Schedule” under Task 2, include itemized line item for services to <br />provide community wide public relations/educational awareness for the City’s <br />implementation, if Bidder has the ability to provide such services. This may <br />include general awareness brochures/handouts (electronic version), local press <br />releases, web site content of program overview and resources. <br /> <br />d. Prepare the draft CCCP for City review and comment no later than May 2025. Consultant <br />may be requested to assist as technical support in informational meeting(s) at City Council <br />or public workshops. Consultant shall incorporate comments from City into the final <br />report ready for submittal prior to July 1, 2025. <br />i. Include in consultant “Fee Schedule” how technical support assistance for public <br />workshops or City Council meetings will be charged (e.g. hourly rate, if in-person <br />is travel included). <br /> <br />e. In developing the CCCP, the consultant shall prepare a template that can be used by the <br />City in preparation of future updates. <br /> <br />Docusign Envelope ID: A449BB28-7A6A-4FA5-96EA-B9D2D5B83889