Laserfiche WebLink
●DRYWALL & FINISH 43,818$ <br />● <br />●Patch and repair new Electrical/Data in existing walls <br />●Seal and Fire Caulk all penetratins in Fire Rated Demising Wall <br />●Patch supply air in Retroom 3008 <br />●Patch and Repairs in Breakroom 3009 <br />●PAINTING 46,666$ <br />●Furnish labor and materials to paint the following areas includes (1) coat of primer, (2) Coats of Paint, Sherwin Williams or equal. <br />●Paint all New and Existing Demising walls in Open Office 3011 <br />●Paint all Existing Walls including over ring in Office 3013 <br />●Paint Stained Wood Sill, 1 location <br />●Paint Existing Gypsum Board Ceilings in Restroom 3008, Break 3009, Back Entry 3010 <br />●Furnish and install new FRP in Restroom 3008, 4' high <br />●Paint new wall in Restroom 3008 above FRP <br />●Paint Existing Door in Restroom 3008 <br />●Paint New Wall at Storage 3007, 7-6" High <br />●FLOORING / REMOVE AND REPLACE 3,660$ <br />●New Epoxy Cove Base at New Restroom Wall <br />●Patch Existing Epoxy Flooring and Provide new epoxy coat in Breakroom 3009 <br />Division 15000 - Mechancial <br />●Plumbing 6,900$ <br />Replace flush valve with dual flush and handle per ADA, Restroom 3008 <br />Relocate Plumbing in Wall for Lavatory, no more than 18" from current location. Exludes any underground plumbing <br />Install Owner Furnished lavatory, faucet and bracket in Restroom 3008 <br />Remove and salvage lavatory, faucet and bracket in Restroom 3008 <br />Furnish and install (1) Stainless Seel Sink, single bowl, over the counter. Includes (1) Faucet <br />Division 16000 - Electrical <br />●Electrical 5,760$ <br />●Furnish labor and materials to install new receptacles in Open Office 3011, Lobby 3012, 8 total. <br />●New Electrical and Date with Conduit Sweep to Above Lay-in Ceiling, Typecal, 8 locations. <br />●Rewiring of storage lights to new 3-Way Switch in Supervisor's Office #xxxx - CONFIRM <br />●New GFCI Outlet in Breakdroom 3009 <br />Life Safety, Fire Alarm and Fire Sprinklers -TBD <br />Furnish labor and materials to finish and prime with West Pack Prep Coat, Level for all new walls in Storage 3007, Open <br />office 3011, Lobby 3012, Restroom 3008 <br />2024-044 3333 Busch Road OSC Proposal <br />2 <br />Docusign Envelope ID: 5BAAB023-F505-4D97-B8B7-10D2069DCBD0