My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC. #2024610
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC. #2024610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2024 12:33:48 PM
Creation date
10/2/2024 12:33:18 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
WILSON GENERAL CPNTRACTING, INC. #2024610
Contract Record Series
704-05
Munis Contract #
2024610
Contract Expiration
12/31/2024
NOTES
OSC - SEWER/PUBLIC RECORDS REMODEL PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delivered via Email <br />DC Construction Inc. <br />Operation Service Center, Sewer Building 1068 44th Ave <br />3333 Busch Road Oakland, CA 94601 <br />Pleasanton, CA Donny Chu <br />RE: OSC Sewer Building Office/Storage/Restroom Remodel Proposal <br />Dear David Luera, <br />Description of Work <br />Div 1000 - General Conditions <br />●Project Management, Superintendent, Project Engineer 20,010$ <br />●Other general conditions include:6,195$ <br />●Quality Control, Punch List, Warranty <br />●Dust Protection, Project Staging, Small Tools <br />●Daily Site Cleaning <br />●Temporary Site Facilities (toilet rentals, dumpster ) <br />●Safety, Tools and Equipment <br />●Protections and Dust Proofing <br />Div 2000 - Demolition <br />●1,836$ <br />●Demo, haul off and dipose of 10' of existing wood base cabinets in Office 3013 <br />●Remove Locker Base in Breakroom 3009 <br />●Remove Door in Breakroom 3009 <br />Div 6000- Rough /Finish Carpentry & Architectural Woodwork <br />●DC Construction to provide labor and materials for new carpentry including:26,058$ <br />● <br />● <br />● <br />●Frame new Door Opening for Restroom 3008 <br />●Install Owner furnished door with new Lever Lockset <br />ARCHITECTURAL WOODWORK ALLOWANCE OF $10,000 <br />Furnish and install new P-Lam Base and Upper Cabinets, overlay doors with Concealed Hinges <br />Furnish and install new Solid Surface Countertop with 4" Backsplash <br />Div 9000 - Finishes <br />New 4" Metal Stud Interior Wall Full Height in Restroom 3008. 4" 20 GA Metal Studs, 16" o.c. with 1/2" Gypsum Board <br />both sides, Level 4 Finish <br />DC Construction to provide labor and materials to perform the following : <br />New 4" Metal Studs Inteiror Wall, 7-6" High in Open Office 3011 and Lobby 3012 per Layout Provided. 4" 20 GA. Metal <br />Studs, 16" o.c. with 1/2" GB Board both Sides, Level 4 Finish. <br />New 4" Metal Stud Interior Wall Full Height in Storage Room 3007. 4" 20 GA Metal Studs, 16" o.c. with 1/2" Type X <br />Gypsum Board both sides, Level 4 Finish <br />May 22, 2024 <br />PROJECT ESTIMATE <br />We are pleased to provide you with the Bid Proposal for remodeling of the Sewer Building at Operation Service Center per the email and sketcheds provided dated <br />5/17/24. Proposal includes Prevailing Wage for City Of Pleasonton. DC Construction is available to start this project immediately. This Proposal is Valid for 90- <br />days <br />DC construction will provide labor, equipment, disposal fees and haul off debris included: <br />2024-044 3333 Busch Road OSC Proposal <br />1 <br />Docusign Envelope ID: 5BAAB023-F505-4D97-B8B7-10D2069DCBD0
The URL can be used to link to this page
Your browser does not support the video tag.