Laserfiche WebLink
Summary <br />●Sub-Total Cost 160,903$ <br />●Insurance 1%2,253$ <br />●Overhead 9.0%14,684$ <br />●Profit 9.0%16,006$ <br />●TOTAL 193,845$ <br />ADD ALTERNATE 1: New occupancy sensors at Existing Lighting for Open Office 3011 & Back Entry 3010 8,580$ <br />ADD ALTERNATE 2: Patch and new coat floor paint at Open Office and Entries 20,579$ <br />4,616$ <br />Exclusion / Clarification <br />●Permit Fees, Encroachment Permit Fees, Special Inspections, Title 24 Fees, Architect Design Fees, EBMUD Fees <br />●Any abatement work, unless specified in scope of work – hazardous material, contaminated soils removal. <br />●Any dry rot not included in the above scope of work, will be priced accordingly to repair. <br />●Work to be performed on regular business hours. Monday-Friday from 8am-5pm <br />●Items not noted in the scope of work above. <br />●Removal of any owner owned furniture. Space must be clear from any standone and/or wall attached furniture/fixtures. <br />●Soils Testing - No soils report provided <br />●Lead/Asbestos Testing <br />●Any EBMUD required repairs <br />●Removal of any Existing Drywall not listed in the drawings unless associated with areas to be upgraded <br />●Removal of any electrical, plumbing, mechanical devices unless specifically listed above <br />●Excludes any modification, repairs, of any type on the exterior of the building unless specifically specified above. <br />●Excludes any Life Safety, Fire Alarm, Fire Sprinklers <br />●Excludes subpanels modifications of any type <br />Client Signature <br />Client Printed Name <br />Date <br />ADD ALTERNATE 3: Furnish labor and material to Furr (1) wall in Restroom 3008. Furnish labor and material to <br />install new Coved Epoxy Base in Restroom 3008, (1) Wall <br />2024-044 3333 Busch Road OSC Proposal <br />3 <br />Docusign Envelope ID: 5BAAB023-F505-4D97-B8B7-10D2069DCBD0