Laserfiche WebLink
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />BUILDING PLAN REVIEW FEE <br />BUILDING LIFE SAFETY PLAN REVIEW FEE <br />COPY MODEL PLAN REVIEW FEE <br />ON-SITE PERMIT PLAN REVIEW FEE <br />DEFERRED SUBMITTAL PLAN REVIEW FEE <br />ADDITIONAL PLAN REVIEW FEE <br />EXPEDITED PLAN REVIEW FEE <br />HOURLY PLAN REVIEW RATES <br />$180 <br />ON-SITE PERMIT FEE <br />KITCHEN REMODEL PERMIT FEE <br />$535 <br />BATHROOM REMODEL PERMIT FEE <br />$375 <br />RESIDENTIAL REROOF PERMIT FEE <br />$290 <br />RESIDENTIAL SWIMMING POOL PERMIT FEE <br />$860 <br />FOUNDATION ONLY PERMIT FEE <br />Permit fee for a kitchen remodel within a dwelling, including Sub-Trade fees. <br />Each bathroom remodel within a dwelling, including Sub-Trade fees. <br />Each one- or two-family dwelling reroof, including garage. <br />Each swimming pool at a one or two-family dwelling, including Sub-Trade fees. <br />10% of the Project Permit Fee <br />Permit for a new foundation system separated from and prior to issuance of a <br />building permit for a new Structure. <br />1% of On-Site Valuation <br />5% of Plan Review Fee, One- <br />hour minimum* <br />Time and Material, One-hour <br />minimum* <br />Additional 50% of Plan Review <br />Fees <br />Plan Review of utility, accessibility or other permitted improvements outside of a <br />Structure on private property. <br />Required at the time of deferred submission of plans and documentation <br />whenever any project component, such as sub-trade plans, floor or roof truss <br />packages, etc., are submitted after building permit issuance. <br />Applied when more than two resubmittals require review to the intital plan <br />review, or for revisions to previously approved plans. <br />When requested by an applicant and staff is available, the following surcharge <br />will be added for an expedited plan review. <br />*All Hourly Plan Review Fees are based on fully burdened plan checker cost or <br />current consultant hourly rate, whichever is applicable. <br />2% of On-Site ValuationPermit fee for utility, accessibility or other permitted improvements outside of a <br />Structure on private property. <br />OTHER PERMIT TYPES AND FEES <br />75% of Permit Fees, One-hour <br />minimum* <br />100% of Permit Fees, One- <br />hour minimum* <br />25% of Model Plan Review <br />Fee <br />When plans and documents are required, a plan review fee shall be paid at the <br />time of submittal for plan review. <br />When plans and documents are required, and the review includes life safety <br />and egress, a plan review fee shall be paid at the time of submittal. <br />For each building permit in a development after the model plan review has <br />been approved. <br />PLAN REVIEW <br />IV. Building: 10 of 52 <br />Page 39 of 102