My WebLink
|
Help
|
About
|
Sign Out
Library Commission Agenda Packet 10032024
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
LIBRARY
>
2024
>
10032024
>
Library Commission Agenda Packet 10032024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 4:21:39 PM
Creation date
9/30/2024 4:19:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />B. Electrical Permit Fees Eff 01.01.2024 <br />ELECTRICAL PLAN REVIEW FEE: <br />ADDITIONAL ELECTRICAL PLAN REVIEW FEE: <br />Residential Electrical Permit Fee <br />$120 <br />Non-Residential Electrical Permit Fee <br />$120 <br />$120 <br />Electrical Service Panel or Subpanel, up to 1,000A, each $175 <br />Electrical Service Panel or Subpanel, over 1,000A, each $235 <br />Illuminated Signs, Outline Lighting and Marquees, each circuit $120 <br />Busways, each 500 lineal feet or fraction thereof $120 <br />Residential Up to 10kW $250 <br />Over 10kW $450 plus $15/kW above <br />15kW <br />Commercial Up to 50 kW $1,000 <br />Each additional kilowatt from 51kW- 250kW $7 <br />Each additional kilowatt over 250kW $5 <br />Up to and including 49, each $118 <br />Up to and including 99, each $175 <br />Over 100, each $235 <br />Photovoltaic Systems (includes Plan Review Fee) <br />Fees set by State per Gov. 66015 <br />ELECTRICAL PLAN REVIEW <br />ELECTRICAL PERMIT FEES <br />Power Apparatus, Generators, <br />Transformers, etc. (Rating in HP, kW, <br />or kVA,) <br />When an electrical plan not associated with a building permit is submitted for <br />review. <br />Applied to all plan check correction lists in excess of two revised or resubmitted <br />plan submittals, or for revisions to previously approved plans. <br />Any permit for Electrical work not itemized, in conjunction with an associated <br />Building Permit in a one-or two-family dwelling, or within a multi-family unit. <br />Any permit for Electrical work not specifically itemized, in conjunction with an <br />associated Building Permit in a multi-family or non-residential building. <br />Receptacles, lighting switches, luminaires, other electrical outlets or appliances <br />requiring a permit not within a residential unit, up to 20A, each 1,000 ft2 of floor <br />area. <br />75% of Electrical Permit Fee <br />1hr minimum* <br />Time and Material Basis, <br />1-hr minimum* <br />IV. Building: 11 of 52 <br />Page 40 of 102
The URL can be used to link to this page
Your browser does not support the video tag.