My WebLink
|
Help
|
About
|
Sign Out
Library Commission Agenda Packet 10032024
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
LIBRARY
>
2024
>
10032024
>
Library Commission Agenda Packet 10032024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2024 4:21:39 PM
Creation date
9/30/2024 4:19:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/3/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />IV. BUILDING AND SAFETY DIVISION <br />A. Building Permit Fees PMC 20.04.015 Eff 01.01.2024 <br /> - Dwellings <br /> - Garages & Accessory Structures <br />Total Project Valuation Base Fee <br />$1 - $1,000 $120 <br />$1,001 - $2,000 $145 <br />$2,001 - $25000 $180 $16.30 <br />$25,001 - $50,000 $555 $13.80 <br />$50,001 - $100,000 $900 $9.70 <br />$100,001 - $500,000 $1,385 $7.99 <br />$500,001 - $1,000,000 $4,580 $6.38 <br />$1,000,001 and above $7,770 $5.55 <br />TITLE-24 ENERGY SURCHARGE <br />ACCESSIBILITY SURCHARGE <br />GREEN BUILDING SURCHARGE <br />SWPPP (STORM WATER) SURCHARGE <br /> - Commercial & Industrial Buildings <br />ALTERATIONS & REPAIRS <br />- Remodels, Repairs, Reroofs, Tenant Improvements, <br />etc. <br />15% of Building Permit Fee <br />15% of Building Permit Fee <br />15% of Building Permit Fee <br />Applicable to plan review of all projects requiring compliance with State of <br />California Accessibility, FHAA and/or ADA Requirements. <br />For all permits requiring compliance with California Green Building Standards <br />(Includes Waste Management Fee). <br />For all covered projects requiring on-site stormwater treatment or pre- <br />treatment. <br />Unless specified elsewhere, applicable to all projects with multi-trade <br />construction being performed in conjuction with a building permit. 25% of Building Permit Fee <br />25% of Building Permit Fee <br />ELECTRICAL/MECHANICAL/PLUMBING (EMP) PERMIT SURCHARGE <br />Unless specified elsewhere, applicable to permitted projects subject to <br />compliance with Title 24, Part 6, The California Energy Code. <br />NEW CONSTRUCTION & ADDITIONS <br />Plus <br />for each additional $1,000 (or fraction thereof) up <br />to and including $50,000. <br />for each additional $1,000 (or fraction thereof) up <br />to and including $100,000. <br />for each additional $1,000 (or fraction thereof) up <br />to and including $500,000. <br />for each additional $1,000 (or fraction thereof) up <br />to and including $1,000,000. <br />for each additional $1,000 (or fraction thereof) <br />Permit Valuation shall be determined by the New Construction <br />Valuation Table of the Building Division in effect at the date of <br />application, or as otherwise determined by the Building and <br />Safety Official. The Table shall be revised annually on <br />January 1 by the percentage increase or decrease in the <br />Engineering News Record Construction Cost Index (CCI) for <br />the San Francisco Bay Area. <br />Contract price of the work being performed, or as otherwise <br />determined by Building and Safety Official. <br />BASIC FEE SCHEDULE <br />PERMIT SURCHARGES <br />VALUATION SCHEDULE <br /> for each additional $1,000 (or fraction thereof) <br />up to and including $25,000. <br />IV. Building: 9 of 52 <br />Page 38 of 102
The URL can be used to link to this page
Your browser does not support the video tag.