My WebLink
|
Help
|
About
|
Sign Out
MARK THOMAS & COMPANY, INC. (2)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
M
>
MARK THOMAS & COMPANY, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 3:29:05 PM
Creation date
7/31/2024 3:28:55 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
Amendment
NAME
MARK THOMAS & COMPANY, INC.
Contract Record Series
704-05
Munis Contract #
2023416
Contract Expiration
12/31/2025
NOTES
WEST LAS POSITAS BLVD. MULTIMODAL RECONSTRUCTION PROJECT, CIP 11514
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Mark Thomas shall task a field crew to survey the location of potholed utilities and provide the horizontal and <br />vertical location of the reference points set by others (potholer). This data will be updated in the utility base map <br />and provided to the engineering team to facilitate design. This scope of work is limited to three (3) days of field <br />work. It is assumed that field crews will mobilize after all potholes have been completed. <br />TASK 2 DELIVERABLE(S): <br />• Supplemental Survey and Pothole Location Survey – AutoCAD Format <br />• Optional: Boundary Mapping (20 Scale) – AutoCAD Format <br />• Optional Task Item: - TCE Exhibits (Up to 48) <br />• Composite Utility Relocation Plan <br />• Utility “B & C Letters” <br />• Pothole Work Plan <br />• Allowance: Utility Pothole Reports (Up to 45) <br />• All deliverables to be submitted electronically in .pdf format unless specified otherwise <br />Task 4. ENVIRONMENTAL CLEARANCE <br /> As a subconsultant to Mark Thomas, Circlepoint will manage the environmental review effort and maintain <br />close contact with City staff and the engineering team throughout the project design phase and the <br />environmental review process. <br />The following scope of work reflects this level of effort. <br />Task 4.1. CEQA Addendum <br />Project improvements are referenced in the 2021-2022 Capital Improvement Plan, the 2018 Bike and Pedestrian <br />Master Plan, and the West Las Positas Boulevard Bikeway Feasibility Study. Circlepoint has conducted a <br />preliminary review of the City of Pleasanton planning documents, and we anticipate preparation of a focused <br />addendum to the 2009 Bike and Pedestrian Master Plan IS/MND would be the appropriate approach to clear the <br />project under CEQA, assuming the City has retained complete records of this CEQA document. If the City has <br />prepared a more recent CEQA document to support the 2018 Bike and Pedestrian Master Plan, we will tier from <br />that document in lieu of the 2009 IS/MND. The focused addendum would be structured as a memorandum <br />focusing on key environmental topics, including biological and water resources, cultural resources, and <br />construction-period air quality and noise. To the extent feasible, Circlepoint would leverage previous analysis <br />conducted and would develop a streamlined environmental document to allow for a more cost effective and <br />efficient environmental review process. <br />Circlepoint will review prior technical analyses and CEQA documentation completed by the City to confirm the <br />project would not result in any new or more significant impacts under CEQA. To support this anticipated <br />conclusion as well as to support NEPA clearance, supplemental technical reports will be prepared as described <br />below and under Task 4.2. <br />CEQA-specific technical memos: <br />• Air Quality/GHG: Circlepoint will retain a qualified technical specialist to prepare a memorandum <br />comparing the project with the 2009 IS/MND, to demonstrate whether the project would result in <br />new or greater impacts. <br />• Cultural Resources: Circlepoint will utilize a qualified technical specialist to prepare a memorandum <br />evaluating whether the 2009 IS/MND fully captured potential project impacts to historic and <br />archeological resources. The memorandum will address building/potential historic resources that now <br />meet the minimum age for NRHP evaluation (but did not meet that criteria in 2009). Because the <br />project is entirely within the ROW and the project type is consistent with existing conditions <br />(transportation facility), no new impacts are anticipated. <br />Docusign Envelope ID: CFB4D269-E371-4DA6-B769-59DDBD4C7856Docusign Envelope ID: B363250F-E21F-4652-B170-E77C9043D4FB
The URL can be used to link to this page
Your browser does not support the video tag.