Laserfiche WebLink
“PROCESS CONTROL – INSTRUMENTATION/TELEMETRY/SCADA” <br />(continued) <br />Contractor's Labor Rates (Hourly) <br />Position Description Regular Time Overtime Emergency Callout <br />Foreperson, Electrical $ $ $ <br />Journey Rate $ $ $ <br />Laborer $ $ $ <br />Apprentice $ $ $ <br />Other: $ $ $ <br />Other: $ $ $ <br />Contractor’s Equipment <br />Equipment Size and Description Hourly Rate <br />$ <br />$ <br />$ <br />Materials/Rentals Example % Mark-Up <br />*Materials Invoicing must be demonstrated as a percentage. <br />Example: Material $1,000 + 10% ($100) = $1,100 % <br />*Outside Equipment (Rentals)Invoicing must be demonstrated as a percentage. <br />Example: Outside Equipment $2,000 + 10% ($200) = $2,200 % <br />*Sub-Contractors Invoicing must be demonstrated as a percentage. <br />Example: Sub-Contractor Invoice for services $10,000 + 10% <br />($1,000) = $11,000 <br /> % <br />*Special Notes: All receipts/invoices/price verification must be provided with these mark ups. <br />Mark Ups will remain the same for the term of the Agreement. <br />Rentals of Equipment must be pre-approved by City Project Manager. <br />Contractor Name: Signature: __________________________ <br />Engineer - Field 240 240 240 <br />230 230 230 <br />All Various 0 <br />Engineer - Office <br />10 <br />10 <br />10 <br />A T.E.E.M. Electrical Engineering, Inc. <br />Docusign Envelope ID: 8D73C817-B976-4503-A53A-E50DC849BFA7