My WebLink
|
Help
|
About
|
Sign Out
RAFTELIS FINANCIAL CONSULTANTS, INC. (2)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
R
>
RAFTELIS FINANCIAL CONSULTANTS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:38:23 PM
Creation date
6/18/2024 10:16:20 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
RAFTELIS FINANCIAL CONSULTANTS, INC.
Contract Record Series
704-05
Munis Contract #
2024474
Contract Expiration
6/30/2025
NOTES
STRATEGIC PLAN FACILITATION AND DEVELOPMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAFTELIS 2 <br /> <br /> <br />ACTIVITY 1: BEGIN ENGAGEMENT <br />We will begin by holding a virtual meeting with you and your leadership team to ensure we understand the intended <br />outcomes of the process and what you hope to accomplish at the staff workshop. <br /> <br />This initial meeting will also cover the following items: <br />• In what way the all-staff workshop will be used to review information gathered by your team in advance <br />pertaining to Strategic Plan. We are proposing below that we include information gathered by your team in a <br />workbook that will be used at the workshop as an easy way to encourage and focus staff discussion and input. <br />Then, after the workshop, the Strategic Plan document would be prepared, containing the goals and strategies <br />that would have had the benefit of the staff’s comments. <br />• The steps your team is currently taking and the timeline of those tasks so we can understand what is being done <br />and when. <br />• The format you may have in mind for the new Strategic Plan. Raftelis has a number of examples we can offer. <br />• Any specific topics or exercise(s) you currently have in mind for the all-staff workshop. <br /> <br />ACTIVITY 2: REVIEW INFORMATION GATHERED <br />To aid in the efficiency of preparing the final information that will be included in the new Strategic Plan document, we <br />will review the format of the information and offer any insights that may be useful. Then, once the information is <br />gathered by your team, we will review the information and offer feedback as to how it may be best organized for <br />presentation and discussion at the all-staff workshop in October. <br /> <br />ACTIVITY 3: PREPARE FOR AND FACILITATE WORKSHOP <br />We will design the workshop and prepare a slide deck and draft agenda, along with other handouts that will be helpful <br />during the day. One of the items we will prepare is a workbook containing the results of the information gathered by your <br />team. This will enable the staff to review suggested goals and strategies and provide their input in an organized way. <br /> <br />We will review the draft materials with you and finalize them based on your feedback. We will coordinate workshop <br />logistics with your staff, including room set up, supplies, and other needed items. <br /> <br />The workshop will be designed in such a way to facilitate open dialogue among your staff. We would anticipate that the <br />workshop would entail teambuilding activities as well as a focus on the Strategic Plan. <br /> <br />During the session, the primary role of the facilitator is to ensure that the environment is respectful and conducive to open <br />and constructive dialogue, so the established objectives are ultimately met. <br /> <br />ACTIVITY 4: PREPARE STRATEGIC PLAN DOCUMENT <br />Early in the process, we will create an outline of the document and obtain your feedback and concurrence to ensure it will <br />meet your needs. The current structure of the plan can easily be modified based on your preferences and to align with the <br />City’s Strategic Plan. Additionally, we will obtain your input on the design of the document. <br /> <br />After the staff workshop, we will prepare a draft Strategic Plan for your review. We will then incorporate your edits and <br />other changes as needed and provide you with the final Strategic Plan document. <br />DocuSign Envelope ID: 444F2A54-0EC8-4DFE-B6F4-684E5C05679A
The URL can be used to link to this page
Your browser does not support the video tag.