My WebLink
|
Help
|
About
|
Sign Out
WOODWARD & CURRAN, INC. (FIRST AMENDMENT)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WOODWARD & CURRAN, INC. (FIRST AMENDMENT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2024 3:17:44 PM
Creation date
5/29/2024 1:48:25 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Design Professionals
Contract Type
Amendment
NAME
WOODWARD & CURRAN, INC. (FIRST AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2024335
Contract Expiration
12/31/2025
NOTES
DESIGN PROFESSIONAL SERVICES AGREEMENT FOR POTABLE WATER PIPELINE & BOOSTER STATION DESIGN SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2, 2024 Page 3 of 4 <br /> <br />• Written responses to submittals using Woodard & Curran submittal review template (.pdf via email) <br />• Written RFI responses using Woodard & Curran RFI response template (.pdf via email) <br />• Final system checkout letter report (.pdf via email) <br />Task 4.3 –Construction Survey Staking. <br />Woodard & Curran’s subconsultant Guida will provide the following scope of services: <br />• Verify existing control: Survey control points will be set once for the construction of the project. The contractor shall protect survey points throughout the length of the project. The contractor will give 48-hour <br />advance notice to the City and Guida if control points need to be relocated. If control is removed this may result in additional charges. Guida must have a two-day advance notice and access before work is to begin. <br />Any less notice may cause the work to be delayed. <br />• Staking of the F1 pipeline alignment (10’ offset – all horizontal and vertical bends) Pipeline runs along Stoneridge Drive, from Hopyard Road to Johnson Drive (3,500 feet) <br />• Stake proposed facilities at pump station site at SW corner of Hopyard Road and Stoneridge Drive. <br />• Turnout Vault (4 corners) <br />• Pump Station Building pad (4 corners) <br />• Transformer Location <br />• Flushing Station Structure <br />• Other facilities, as requested. <br />• Staking of the pipeline alignment (10’ offset – all horizontal and vertical bends) along Sunol Blvd, from <br />Sycamore Road and to Bernal Avenue (4,500 feet) <br />Assumptions: <br />• Stoneridge work assumes a total of four site visits. <br />• Sunol work assumes a total of four site visits. <br />• City will provide access to the site during normal business hours (7a to 4p, Monday through Friday). <br />• No permits of any kind will be required. If permits are required, they will be provided at no cost to Guida and Woodard & Curran. <br />• Traffic Control to be provided by City or its construction contractor. <br />• All staking will be done in no more than four visits for each pipeline project. <br />Exclusions: <br />• Traffic Control <br />• Monument preservation <br />• Corner Records or Records of Survey <br />Deliverables: <br />• As-staked sheets, plots and point files in .pdf format. <br />Compensation <br />The total additional compensation budget for Engineering Services authorized under this Amendment No. 1 is <br />$110,000, as summarized below and in the attached fee spreadsheet. <br />DocuSign Envelope ID: 60B6EEC2-10BD-4EC9-B10A-6E8815C273FBDocuSign Envelope ID: 8F2AFB71-059A-494E-940A-F220B3CC700D
The URL can be used to link to this page
Your browser does not support the video tag.