My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 1:56:35 PM
Creation date
5/16/2024 2:16:56 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
New
NAME
WILSON GENERAL CONTRACTING, INC. 2024558
Contract Record Series
704-05
Munis Contract #
2024558
Contract Expiration
7/31/2024
NOTES
CONSTRUCTION AGREEMENT OSC -PARKS RE-MODEL PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson General Contracting Inc. <br />1852 W 11 St., Suite 149 <br />Tracy, CA 95376 <br />(925) 915 1606 <br />w_generalcontractor@yahoo.com <br />http://www.wilsongeneralcontracting.com <br />Proposal <br />ADDRESS <br />City of Pleasanton <br />3333 Bush Rd. <br />Pleasanton CA, 94566 <br />Park Division <br />DATE <br />04/01/2024 <br />TOTAL <br />$96,156.00 <br />ACTIVITY QTY RATE AMOUNT <br />Framing <br />Frame new walls inside the workshop with <br />metal studs with door opening, frame false <br />wall right next to the metal exterior wall for <br />insulation purposes. Frame new window <br />opening in the office area 4x8 window will be <br />done by others. Block and install wood or <br />metal backing for foldable workshop tables <br />hanging on the walls. <br />1 12,971.00 12,971.00 <br />Electrical <br />Rough in new receptacles all through out <br />walls and work table receptacles, switch for T <br />bar lights. Install T bar LED lights Qty 6 2x2 <br />lights. <br />1 18,000.00 18,000.00 <br />Plumbing <br />Remodel existing wall mount sink, CAP hot <br />and cold water supply line inside wall, CAP <br />ABS or copper waste drain inside wall <br />dispose all debris. <br />1 3,782.00 3,782.00 <br />Insulation <br />Insulate all new walls R13 or R19. <br />1 4,000.00 4,000.00 <br />Drywall <br />Install 5/8 drywall all new walls, tape, skim all <br />joints, smooth finish. <br />1 10,921.00 10,921.00 <br />Primer and Paint <br />Primer and paint all new drywall, new door <br />and trims. <br />1 6,800.00 6,800.00 <br />EXHIBIT A <br />DocuSign Envelope ID: A09C14EB-53DE-46B6-BC81-69B61C978439
The URL can be used to link to this page
Your browser does not support the video tag.