Laserfiche WebLink
ACTIVITY QTY RATE AMOUNT <br />Ceiling Heater <br />Relocate shop ceiling heater away from new <br />wall estimated 3 ft away. <br />1 1,900.00 1,900.00 <br />Fire Sprinkler <br />Drop new fire sprinkler heads in the new <br />room build out connect to existing sprinkler <br />above estimated Qty 4 sprinkler heads. <br />1 8,900.00 8,900.00 <br />Carpet <br />Prep shop for floor install new 24'x24' carpet <br />tile glue down. <br />1 8,340.00 8,340.00 <br />Doors <br />Install pre hung commercial door right hand <br />swing with a threshold. <br />1 2,200.00 2,200.00 <br />Cove Base <br />Install rubber cove base in the new room <br />build out. <br />1 2,460.00 2,460.00 <br />Foldable Tables <br />Install new foldable table made by Uline <br />24x60 Qty 8. <br />1 3,782.00 3,782.00 <br />T Bar <br />Install new T bar grid with new T bar tile in <br />the new room build out. <br />1 8,500.00 8,500.00 <br />HVAC <br />Run new ducting supply and return connect <br />to the existing HVAC in existing offices Qty 2 <br />supply, Qty 1 Return. <br />1 3,600.00 3,600.00 <br />TOTAL $96,156.00 <br />THANK YOU. <br />Accepted By Accepted Date <br />EXHIBIT A <br />DocuSign Envelope ID: A09C14EB-53DE-46B6-BC81-69B61C978439