Laserfiche WebLink
28246 Crown Valley Parkway F-216, Laguna Niguel, CA 92677 <br />www.kayugasolution.com <br />4.Task 4 - Perform Risk Assessment <br />Although assets may look the same in the asset register, not all assets are of equal importance. Based on location <br />and functionality, the same type of asset may completely differ in importance to the City (e.g., an asset in a <br />neighborhood park vs. community park). Kayuga will utilize the concept of risk to help differentiate and prioritize <br />the City’s assets. Under limited resources and budget, the City will be able to utilize risk to help consistently and <br />transparently prioritize the work to be performed and the budget required to mitigate the highest risk <br />Risk will be based on the probability of failure (i.e., timing <br />to failure) and consequence of failure (i.e., criticality, <br />impact of failure). The probability of failure will be based <br />on the condition score or age of the asset. Kayuga will <br />work with the City to determine the appropriate <br />consequence of failure assessment methodology. Every asset <br />in the asset register will receive a risk score. Each risk score <br />will be plotted on a risk matrix to understand which assets <br />are of the highest importance and how much budget it will require to mitigate the highest risk for the City. <br />After the risk assessment, Kayuga will provide the City with documentation of the risk methodology and tools (e.g., <br />risk scoring criteria) used to produce the risk results. Assets presenting the highest risk will be highlighted and <br />discussed with the City. The following figure shows an example of the IRIS risk matrix window showing the distribution of <br />assets in different risk levels. Each cell in this matrix can be clicked to show the list of assets and their associated attributes <br />and costs. <br />The figure to the right shows an example of the IRIS risk map viewer window showing <br />asset locations within a park and their associated risk level represented in red (high), <br />amber (medium), and green (low). An additional filtering mechanism enables selection <br />of all high-risk assets for possible project bundling. <br />Deliverables <br />•Risk assessment methodology <br />•PoF, CoF, and Risk scores <br />•Risk assessment configuration and data upload in IRIS <br />DocuSign Envelope ID: 2AC71EFF-5DE0-4EA1-85F8-30219C7F24ECDocuSign Envelope ID: 5C9E3D6D-78BE-43C5-A919-929E9BC66BC0